This is how the work of the new road is going on in Krishnabhir, preparing to open it in August
Kathmandu. The Prithvi Highway has been blocked for 14 days after the flood that came to Trishuli via Bhotekoshi eroded the lower part of the road along the river bank. On August 14, 100 meters of the road was washed away after Trishuli cut the base of the road at Krishnabhir in Dhading, which is considered to be the main lifeline connecting Kathmandu.
The work of opening a new track above the Krishnabhir river and preparing it for the smooth movement of vehicles is going on in full swing. The work of cutting the hill and connecting the 250 meter track on both sides has been completed.
Sajna Adhikari, head of planning for the Nagadhunga-Mugling road project, said that the gravel and rolling work will start from Sunday and will be completed within 3-4 days by the end of August. "Graveling is not as easy as cutting. It should be mixed by rolling. It should be done in layers. It cannot be done in one layer," she said, "that's why it may take 3-4 days. The goal is to operate the transport from the end of this month.
Express
Related News
Nepalis in the Gulf region are requested to fill in the details
Kathmandu. Taking into account the situation developed in the Middle East, the portal launched by the Ministry of Foreign Affairs has been promoted and coordinated by various embassies in the Gulf region.
According to the embassy, the portal...
20 Nepalis were rescued from Cambodia and returned home
Kathmandu. 20 Nepalis who were engaged in illegal activities including online fraud and were living without visas in Cambodia have been rescued and returned to their home country. They were rescued by the initiative of the Nepali Embassy in Thaila...
Chance of heavy rains in these areas, department urges to be alert
Kathmandu. At present, the influence of Monsoon air is present across the country. It is generally cloudy all over the country. At present, moderate to moderate rains with thunder and lightning are occurring in the terai areas of Gandaki, Lumbini...
Landslide in Baglung: 10 people died in two days, 24 houses were damaged in Tanahun
Baglung. 10 people died and one person went missing in Baglung due to the landslides that followed the incessant rain. In the last two days, landslides have caused huge human losses in the district. On Sunday alone, 9 people have died and one pers...
Change across the country: Chance of rain with hailstorm in Terai
Kathmandu. According to the Department of Water and Meteorology, Weather Forecasting Division, there is a possibility of moderate to moderate rain and snowfall with thunder and lightning, windstorm, hailstorm at few places in Madhes Province inclu...
The result of SEE will be announced by 29 Baisakh
Kathmandu. The National Examination Board is doing the entry work to publish the results of the Secondary Education Examination SEE within 1 month. The board has prepared to announce the results within 29 Baisakh. According to the Controller...



