This is how the work of the new road is going on in Krishnabhir, preparing to open it in August
Kathmandu. The Prithvi Highway has been blocked for 14 days after the flood that came to Trishuli via Bhotekoshi eroded the lower part of the road along the river bank. On August 14, 100 meters of the road was washed away after Trishuli cut the base of the road at Krishnabhir in Dhading, which is considered to be the main lifeline connecting Kathmandu.
The work of opening a new track above the Krishnabhir river and preparing it for the smooth movement of vehicles is going on in full swing. The work of cutting the hill and connecting the 250 meter track on both sides has been completed.
Sajna Adhikari, head of planning for the Nagadhunga-Mugling road project, said that the gravel and rolling work will start from Sunday and will be completed within 3-4 days by the end of August. "Graveling is not as easy as cutting. It should be mixed by rolling. It should be done in layers. It cannot be done in one layer," she said, "that's why it may take 3-4 days. The goal is to operate the transport from the end of this month.
Express
Related News
Weather Forecast: Chance of heavy rain in Bagmati, Koshi and Gandaki
Kathmandu. At present, the influence of Monsoon air is present across the country. According to the Department of Hydrology and Meteorology, the monsoon low pressure line is located to the south of Sardar place. At present, it is generally c...
Effect of Monsoon air across the country: Chance of heavy rain in hilly areas of 6 provinces
Kathmandu. At present, there is a direct effect of Monsoon air across the country. According to the Department of Water and Meteorology, Weather Forecasting Division, the low pressure line of monsoon is located north of Sardar place, so weather ac...
Nepalis in the Gulf region are requested to fill in the details
Kathmandu. Taking into account the situation developed in the Middle East, the portal launched by the Ministry of Foreign Affairs has been promoted and coordinated by various embassies in the Gulf region.
According to the embassy, the portal...
Chance of light rain in these states
Kathmandu. At present there is a partial influence of western and local winds in Nepal. The rest of the hilly areas including Kosi, Bagmati, Gandaki and Lumbini regions are mostly cloudy, the terai areas of Madhes and Kosi are partly cloudy and th...
How was the weather throughout the country on Thursday?
Kathmandu. At present, the water and weather forecast division has said that the western wind has partial influence in the country and the high hilly and Himalayan regions of Koshi, Gandaki and Karnali provinces are generally cloudy and the weathe...
Effect of Monsoon air across the country including Kathmandu: Which areas are likely to rain?
Kathmandu. At present, the influence of Monsoon air is present across the country. According to the Department of Hydrometeorology, Weather Forecasting Division, the Monsoon low pressure line is currently located in the vicinity of Sardar place.



