October 14, 2026, Wednesday
English

Heavy damage to power sector due to Bhotekoshi flood, 12 projects of 431 MW closed

Main News Image

Kathmandu. About 10 percent of the country's total power generation capacity has been affected due to the floods in the Bhotekoshi River in Rasuwa. After the floods caused great damage to power generation, transmission and distribution structures, power supply management has become a challenge.

According to Viraj Bhakta Shrestha, Minister of Energy, Water Resources and Irrigation, Nepal Electricity Authority is working with high priority to maintain balance between electricity demand and supply. Although the authority has succeeded in keeping the electricity system balanced so far, the necessary preparations have been intensified as there may be more challenges in the future due to the heavy damage caused by the flood.

According to preliminary information, 12 power generation stations with a capacity of 431.1 megawatts have been shut down due to floods and have been disconnected from the power system. Similarly, Minister Shrestha has informed that preliminary information has been received that 15 hydropower projects under construction with a total capacity of 470 megawatts have been damaged.

mediabaaji add

Related News

The fuel facility of certain officials and government employees has been reduced

Kathmandu. In order to control public expenditure and manage the fuel crisis, the government has decided to significantly reduce the fuel facilities provided to government employees and special officials. According to the Ministry of Finance, due...

Instructions to the Insurance Authority to submit a report within 10 days of the questions raised in the Finance Committee

Kathmandu. The Insurance Authority has been instructed to submit the questions raised in the Finance Committee with a report within 10 days. The chairman of the committee gave this instruction in today's discussion.

Insurance Authority Chair...

Gold price drop again, how much per tola on Monday?

Kathmandu. Gold, which fell by 11,600 rupees per tola on Sunday, has also decreased today. Gold tola has decreased by two thousand rupees.
According to the Nepal Gold and Silver Traders Federation, gold tola is be...

Orange sales worth 269 million this year in Baglung

Dhorpatan. This year, Baglung has produced oranges worth Rs. 269 million. With the increase in the interest of farmers towards orange cultivation, the production has increased. Compared to last year, oranges worth Rs 44 lakh more have been produce...

The price of gold and silver increased, how much per tola?

Kathmandu. The price of gold and silver has increased in the Nepalese market. Today, the price of gold has increased by 4 thousand 300 rupees per tola. According to the Nepal Gold and Silver Traders Federation, the price of gold in Chapawal has re...

What is the foreign currency exchange rate on Friday?

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to Rashtra Bank, the buying rate of one US dollar has been fixed at 141 rupees 62 paisa and the selling rate is 142...