Heavy damage to power sector due to Bhotekoshi flood, 12 projects of 431 MW closed
Kathmandu. About 10 percent of the country's total power generation capacity has been affected due to the floods in the Bhotekoshi River in Rasuwa. After the floods caused great damage to power generation, transmission and distribution structures, power supply management has become a challenge.
According to Viraj Bhakta Shrestha, Minister of Energy, Water Resources and Irrigation, Nepal Electricity Authority is working with high priority to maintain balance between electricity demand and supply. Although the authority has succeeded in keeping the electricity system balanced so far, the necessary preparations have been intensified as there may be more challenges in the future due to the heavy damage caused by the flood.
According to preliminary information, 12 power generation stations with a capacity of 431.1 megawatts have been shut down due to floods and have been disconnected from the power system. Similarly, Minister Shrestha has informed that preliminary information has been received that 15 hydropower projects under construction with a total capacity of 470 megawatts have been damaged.
Express
Related News
Jail sentence for those who spread chaos in the banking sector, the National Bank has given a final warning
Kathmandu. Nepal Rastra Bank has said that it has drawn serious attention to the unprofessional and disorderly activities targeting banks and financial institutions and their employees in recent days.
Are you exchanging foreign currency? Find out today's foreign currency exchange rates
Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to Rashtra Bank, the buying rate of one US dollar has been fixed at 141 rupees 75 paisa and the selling rate is 142...
NEPSE index decreased by 25.81 points, how much is the transaction amount?
Kathmandu. On Wednesday, the stock market gauge NEPSE index fell. Today, NEPSE index decreased by 25.81 points and reached 2744.45 points. A total of 1 crore 21 lakh 34 thousand 360 shares of 351 companies were bought and sold in NEPSE, and over R...
Investment of more than 21 billion in two semi-reservoir hydropower projects approved by the Board of Investment
Kathmandu. The 68th meeting of the Board of Investment held today under the chairmanship of Prime Minister Balendra Shah has decided to approve the investment of two semi-reservoir hydropower projects.
The meeting decided to approve the inve...
The south side of Sainik Manch is being greened at 27 million
Kathmandu. The Metropolitan Corporation has prepared to plant ``Varmudha Grass'' worth Rs.
According to Arjun Aryal, Senior Engineer of Kampa Public Works Department, the plan has been put forward to organize an open space for th...
Here is the foreign currency exchange rate today
Kathmandu. Nepal Rastra Bank has determined the foreign currency exchange rate for Wednesday. According to the National Bank, the buying rate of one US dollar has been fixed at 151 rupees 28 paisa and the selling rate is 151 rupees 88 paise. Simil...



