October 14, 2026, Wednesday
English

Heavy damage to power sector due to Bhotekoshi flood, 12 projects of 431 MW closed

Main News Image

Kathmandu. About 10 percent of the country's total power generation capacity has been affected due to the floods in the Bhotekoshi River in Rasuwa. After the floods caused great damage to power generation, transmission and distribution structures, power supply management has become a challenge.

According to Viraj Bhakta Shrestha, Minister of Energy, Water Resources and Irrigation, Nepal Electricity Authority is working with high priority to maintain balance between electricity demand and supply. Although the authority has succeeded in keeping the electricity system balanced so far, the necessary preparations have been intensified as there may be more challenges in the future due to the heavy damage caused by the flood.

According to preliminary information, 12 power generation stations with a capacity of 431.1 megawatts have been shut down due to floods and have been disconnected from the power system. Similarly, Minister Shrestha has informed that preliminary information has been received that 15 hydropower projects under construction with a total capacity of 470 megawatts have been damaged.

mediabaaji add

Related News

Here is the foreign currency exchange rate today

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the National Bank, the buying rate of one US dollar has been fixed at 142 rupees 46 paisa and the selling rate i...

Suryakund Hydro is issuing IPO for general public from Sunday

Kathmandu. Suryakunda Hydro Electric is going to open the IPO sale for the general public from January 18th this Sunday. The company is going to issue a total of 5 lakh 72 thousand 431 shares of Rs 100 to the general public in the second phase.&nb...

NMB Bank launches 'EV Auto Loan' at 0.5% for new electric vehicles

Kathmandu.  NMB Bank Limited has introduced loan facilities for new electric vehicles at a special interest rate starting from 0.5%, targeting the Naima Auto Expo. With the objective of promoting environment friendly transportation and sustai...

Now 100 rupee notes will be available from ATMs

Kathmandu. Nepal Rastra Bank has asked banks and financial institutions to make arrangements to distribute Rs 100 and Rs 100 notes along with Rs 1,000 and Rs 500 notes from the ATMs of banks and financial institutions.

The National Bank thro...

The price of petroleum products has increased, how much is the price per liter?

Kathmandu. The prices of petroleum products have been adjusted. Nepal Oil Corporation has adjusted the prices of petrol, diesel and kerosene with effect from today. According to the corporation, the price of petrol has increased by one rupee per l...

In one day, gold rose by 7,000 tolas and set a new record, how many tolas will be traded today?

Kathmandu. The price of gold in the Nepalese market has reached a historic high. Gold has increased by 7 thousand 100 rupees in a single day and has reached its highest price so far.
According to the Nepal Gold an...