8 billion spent on the north-south road, black paper target up to Korla
Kathmandu. As part of the north-south trade route expansion project, Rs. The project has spent 82 percent of the budget while the proposed cost estimate of the project is Rs 10.57 billion till FY 2081-82.
Under the Korla road of national pride connecting India and China, a 202 km road track has been opened from Maludhunga in the mountain to Nepal-China Korlana. According to the decision of the Council of Ministers on November 12, 2073, Kaligand Corridor 9Beni-Jomsam-Korla road was established as a separate project. Under which the project has been continuously upgrading the roads in Parbat, Myagdi and Mustang sections since 2073 and 74. The last revised completion period of the project has been proposed for the year 2082 and 2083. But since the road up to Korlanaka needs to be paved, it is certain that the completed period will be revised again.
Under this Kaligandaki Corridor road project, the target is to open 202 km of road tracks, 97 km of road gravel, 150 km of tarmac and 19 bridges. According to the target, by the year 2081 and 2082, the project has opened 202 kilometers of road tracks, 94 kilometers of road gravel, 88 kilometers of black paper and construction of 14 bridges have been completed, project chief Tejashwi Sharma has informed.
For Korla road, through the project, 3 km of gravel and 10 km of Kagbeni-Chusang will have to be blacked on 27 km of the road and a new contract will have to be issued for the rest. Under this project, if the 9 Kagbeni-Korla road section is also covered with black, the total cost estimate of the project may be more than 15 billion, according to the head of the project Sharma. According to the head of the project, the goal is to upgrade the road and blacken the entire 202 km double lane of the Korla road section and build the necessary bridge.
Express
Related News
This is the exchange rate of foreign currency on Saturday
Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for 9 Saturday 0 today. According to which, the buying rate of one American dollar has been fixed at 151 rupees 88 paisa and the selling rate is 152 rupees 48 paisa....
Completed 1 day training of National Life Insurance
Kathmandu. National Life Insurance Company has provided 1-day training to agents working in different branch offices of Bagmati and Madhesh provinces who have been selected based on the monthly plan brainstorming 2082 issued by the National Life I...
In one day, the price of gold increased by 3 thousand 200 rupees, gold reached 322 thousand 700 per tola!
Kathmandu. The price of gold has increased significantly in the Nepalese market on Monday. According to the Nepal Gold and Silver Traders Federation, the price of gold has increased by Rs 3,200 per tola in one day. Gold traded at Rs 3 lakh 19 thou...
2nd Economic Enumeration, five days training for enumerators across the country from today
Kathmandu. A five-day training program for the enumerators selected for the second national economic census, 2082, to be conducted by the National Statistics Office, is starting simultaneously across the country from today. Enumerators are going t...
NEPSE fell by 10.25 points, trading fell to 8 billion 61 crores
Kathmandu. On the third trading day of the week, NEPSE index decreased by 10.25 points to 2662.14. Today, 21.17 million 15 thousand 868 shares of 324 companies were bought and sold, and 8.61 billion 64 million shares were traded. Today, while the...
This week, NEPSE has decreased by normal numbers, how much is the transaction on which day?
Kathmandu. This week, NEPSE index decreased by 0.56 points and reached 2714.05 points. NEPSE, which closed at 2714.61 points last week, decreased by 73.18 points to 2714.05 points this week. The market was open for five trading days this week. In...



