Muglin -Malekhu road upgradation work started
Kathmandu. The work of upgrading the Muglin-Malekhu road, which was only a normal work due to the rainy season, has started gaining intensity. After June, the road upgrading work slowed down. After the rain stopped and the festival was over, the work started to be intensified. According to Vijay Darai, engineer of the western section of the Muglin-Malekhu road under the Nagdhunga-Muglin road project, the work has been accelerated. The work on the access road to the bridge has been started. The access roads of four bridges are going to be constructed. Barrier work has been started on the bridge and other parts and drain work has also been started.
According to him, preparations have been made to start the black paper work in two to three days. Out of 38.86 kilometers of that section, eight kilometers of roads have been paved. Final preparations have been made for additional five kilometers of road blacking. According to Darai, the place where the final preparations have been made is about to be blacked out. Along with this, preparation work will be done for the black paper in other places. Among the other two bridges on that road section, one foundation of Charoodi Khol bridge has been laid. On the other hand, both the foundations of the Hoogdi river bridge have been prepared.
According to Darai, 35 percent of road upgrading has been completed so far. In this section, 2.2 km will be six-lane, which will be in Malekhu, Benighat and Muglin sections. The 7.2 km road will have four lanes. Stating that the four lanes will be in the areas of Danda, Kurintar, Fisling, Chumling, Mazhimtar, Charaudi and Vishaltar, Darai said that a three-lane 'climbing' route will be made in the uphill and downhill sections. According to him, the 'climbing' route will be 2.3 km and the rest of the road will be two lanes.
This road was contracted to be completed in three years on 15 January 2079. Under the Prithvi highway, Muglin-Nagdhunga section has been divided into three phases and bids have been invited. This falls under the third phase. It will expire on the 15th of January. Darai said that the process for extending the deadline has gone ahead. He said that the construction company will get an extension of a few months due to design modification etc.
Express
Related News
NEPSE decreased by 37.63 points throughout the week, how much is the transaction on which day?
Kathmandu. This week, NEPSE index decreased by 37.63 points and reached 2671.07 points. NEPSE, which closed last week at 2708.70 points, decreased by 37.63 points to 2671.07 points this week. The market was open on all five trading days this week....
Now police salary will come every 15 days
Kathmandu. The government is going to pay the police every 15 days from the next financial year 2083/84. Nepal Police Head Office, Administration Department Budget Branch on Tuesday issued a circular to the budget management offices across the cou...
IPO sale of Bhujung Hydropower is open, how many shares can be filled?
Kathmandu. Bhujung Hydropower Limited has opened the IPO sale for the public from January 12 today. The company has issued the IPO and distributed it to local residents affected by the project and Nepalese who have gone abroad for employment, and...
Increase in the price of petroleum products
Kathmandu. The price of petroleum products has decreased. With the Indian Oil Corporation sending new prices on Sunday, when the Nepal Oil Corporation adjusted the prices, the prices of diesel and kerosene have decreas...
Petrol reduced by Rs 4 per litre
Kathmandu. Nepal Oil Corporation has reduced the prices of petrol, diesel, kerosene and jet fuel. According to the latest decision of the corporation, the price of petrol has been reduced by Rs 4 per liter and the price of diesel and kerosene has...
On Wednesday, the NEPSE fell by 30.09 points, with debentures the most traded
Kathmandu. On Wednesday, the third day of trading of the week, the stock market gauge NEPSE index decreased. On Wednesday, NEPSE index decreased by 30.09 points to 2621.59 points. A total of 84 lakh 63 thousand 15 shares of 362 companies were boug...



