August 21, 2026, Friday
English

Muglin -Malekhu road upgradation work started

Main News Image

Kathmandu. The work of upgrading the Muglin-Malekhu road, which was only a normal work due to the rainy season, has started gaining intensity. After June, the road upgrading work slowed down. After the rain stopped and the festival was over, the work started to be intensified. According to Vijay Darai, engineer of the western section of the Muglin-Malekhu road under the Nagdhunga-Muglin road project, the work has been accelerated. The work on the access road to the bridge has been started. The access roads of four bridges are going to be constructed. Barrier work has been started on the bridge and other parts and drain work has also been started.

According to him, preparations have been made to start the black paper work in two to three days. Out of 38.86 kilometers of that section, eight kilometers of roads have been paved. Final preparations have been made for additional five kilometers of road blacking. According to Darai, the place where the final preparations have been made is about to be blacked out. Along with this, preparation work will be done for the black paper in other places. Among the other two bridges on that road section, one foundation of Charoodi Khol bridge has been laid. On the other hand, both the foundations of the Hoogdi river bridge have been prepared.

According to Darai, 35 percent of road upgrading has been completed so far. In this section, 2.2 km will be six-lane, which will be in Malekhu, Benighat and Muglin sections. The 7.2 km road will have four lanes. Stating that the four lanes will be in the areas of Danda, Kurintar, Fisling, Chumling, Mazhimtar, Charaudi and Vishaltar, Darai said that a three-lane 'climbing' route will be made in the uphill and downhill sections. According to him, the 'climbing' route will be 2.3 km and the rest of the road will be two lanes.

This road was contracted to be completed in three years on 15 January 2079. Under the Prithvi highway, Muglin-Nagdhunga section has been divided into three phases and bids have been invited. This falls under the third phase. It will expire on the 15th of January. Darai said that the process for extending the deadline has gone ahead. He said that the construction company will get an extension of a few months due to design modification etc.

mediabaaji add

Related News

15 in petrol and Rs 10 in diesel-kerosene

Kathmandu. Nepal Oil Corporation has increased the price of petroleum products. The corporation has increased the price of petrol by Rs 15 and diesel kerosene by Rs 10. After the price hike, petrol in Kathmandu valley has become 172 per liter and...

Hydropower projects in Myagdi were affected by flood and landslides, production of 20 megawatts of electricity was stopped

Myagdi. Due to floods and landslides, the work of the hydropower project under construction in Myagdi has been affected, while the power generation from two projects that are in operation has stopped. The projects of Dhawalagiri, Annapurna and Mal...

The new exchange rate of foreign currency is set, what is the price of US dollar and pound?

Kathmandu. Nepal Rastra Bank has published the official exchange rate of foreign currency for today. According to the Central Bank, today the buying rate of one American dollar is fixed at 154 rupees 21 paisa and the selling rate is 154 rupees 81...

Stock market fell sharply, turnover fell to 9 billion

Kathmandu. The stock market fell on Thursday. Today, the NEPSE index decreased by 33.83 points to close at 2,833.03 points, which is a decrease of 1.18 percent. Today, a total of 207 million 43 thousand 884 shares were bought and sold, and the tra...

What is the exchange rate of which foreign currency on Friday?

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the fixed exchange rate for today, the buying rate of one US dollar is 143 rupees 65 paisa and the selling rate is 144 rupees 25 paisa.

'Middleman's game' in banana prices, farmers' demand to fix minimum support price

Kathmandu. The Federation of Nepal Banana Producers has demanded the government to set the minimum support price for bananas. Through a press conference held on Tuesday, the federation said that such an arrangement is necessary to ensure fair pric...