November 8, 2026, Sunday
English

Laying of pipes for Melamchi water distribution started

Main News Image

Kathmandu. In order to effectively distribute the water of the Melamchi water supply project in the Kathmandu valley, the work of laying a pipe of 1800 mm diameter has been started in the Sundarijal area. According to Project Implementation Directorate PID, this is the largest size diameter pipe ever used for water supply by PID in Nepal.

Chief of Directorate and Engineer Ramkumar Shrestha informed that the construction process for expansion of water distribution in Bhaktapur, Kirtipur, Madhyapurthimi, Kapan, Jorpati and Pepsicola areas has been advanced. Tenders have already been invited for the expansion of water distribution network in five areas. Now other processes will start soon," said Engineer Shrestha.

mediabaaji add

Related News

Lakshmi Pooja Today: Lakshmi, the goddess of wealth, is being worshiped this evening

Kathmandu. Lakshmi Puja is being performed this evening on the third day of Yama Panchak, the goddess of wealth, wealth and prosperity. Based on the belief that Lakshmi does not live in a house that is clean and tidy,...

With the increase in cold, the number of headache patients increased in hospitals in Terai

Kathmandu. With the increase in the cold wave in the Terai region, the number of patients reaching the hospital with the problem of headache has increased significantly. According to doctors, cold air, sudden change in temperature and lack of wate...

The search for those missing in Yalung Ri mountain climbing has been suspended, five people are still missing

Ramechhap. The search for climbers who went missing in the avalanche that occurred last Monday while climbing the Yalung Ri mountain in Rolwaling area of ​​Dolakha has been suspended. Out of the seven missing people, only two bodies have been foun...

Demands ranging from the formation of an all-party mechanism to the implementation of 'EV Safety Education'

Kathmandu. In the meeting of the House of Representatives held on Wednesday, the parliamentarians demanded that an all-party committee should be formed immediately to make the search, rescue, relief and rehabilitation after the devastatng flood in...

A dozer ran in the BP garden area!

Parsa. The Municipal Corporation has run a bulldozer on the temporary structures in the BP Udyan area at Virgunj in Parsa. The Birgunj Metropolitan Corporation has started the evacuation of the area near the Clock Towe...

Ramechhap's bus accident and the post-mortem of the deceased could not be done

Ramechhap. The post-mortem of the person who lost his life in the bus accident that happened on Tuesday in Tamakosi river in Manthali Municipality 6 of Ramechhap has not been done even till Wednesday morning. The postmortem work could not proceed...