September 5, 2026, Saturday
English

China's national highway to Kerung opens, 16 dead and 546 missing

Main News Image

The Kathmandu. Chinese technical and rescue teams have stepped up efforts to reopen a major national highway leading to the port of Kerung in the Tibet Autonomous Region, which has been damaged by a flood caused by a glacier burst in the high mountainous region on the Nepal side.

Quoting the regional government, Chinese media reported that at least 16 people have died in the Kerung region due to floods, while 546 people are still missing. The floods have caused severe damage to various sections of the national highway G-216 leading to the port.

A large number of manpower and equipment have been mobilized for cleaning and construction of the damaged highway. More than 100 workers of China Railway Group Limited are working to prepare the gabion box by filling the stone in the Xinjiang village of Kerung County.

mediabaaji add

Related News

Ministry of Education said: Free MBBS for Genji injured is not against the rules

Kathmandu. The Ministry of Education, Science and Technology has clarified that the decision to give free MBBS study opportunity to Ekta Shah, who was injured during the Genji movement, is not against the law and rules. According to the rules of t...

Export of 1015 MW electricity to India to meet domestic demand on Lakshmi Puja

Kathmandu. Tihar is considered as a festival of lights, light and flowers. The speciality and originality of this festival is celebrating Diwali at home and lighting lamps, lighting the house and decorating it with flowers. Diwali and lights are c...

What is the currency exchange rate of which country today?

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the National Bank, the buying rate of one US dollar has been fixed at 147 rupees 84 paisa and the selling rate is 148 rupees 44 paisa. Simila...

Construction of two hydropower projects of 84 megawatt capacity in Rahughat of Myagdi has been completed

Kathmandu. Tundi Power Company has simultaneously constructed two hydropower projects on the Rahughat River that flows through Raghuganga Rural Municipality of Myagdi. Ghuganga Rural Municipality-4, 7 and 8 Ward No. 4, 7 and 8 of the two projects...

A rise of 47.55 points in NEPSE, the most traded among hydropower companies

Kathmandu. On the first trading day of the week, NEPSE index increased by 47.55 points to 2633.42. Today, 1 crore 34 lakh 68 thousand 145 shares of 328 companies were bought and sold, and 5 billion 53 crore 13 lakh shares were traded. Today, while...

Opening of Nagadhunga tunnel tomorrow, only emergency vehicles will be allowed to ply

Kathmandu. Nepal's first modern transport tunnel 'Nagadhunga-Sisnekhola Tunnel' will be formally inaugurated from Monday.

The total cost of this project, which was completed with the concessional loan of Japan International Cooperation Agenc...