Butwal-Narayangadh road still blocked
Nawalparasi The Butwal-Narayangadh road section, which has been blocked since Friday, has not been fully operational. Transport services were affected after the road became slippery and muddy in the lower section located in Binayi Triveni Rural Municipality-2, east of Nawalparasi Bardghat Susta under East-West Highway.
Yuvraj Khadka, Superintendent of Police, Nawalparasi Bardghat Susta East District Police Office, said that even though the winter rains have stopped, the movement of vehicles is facing difficulties due to the frozen mud on the roads and the flow of mud from the hills. Superintendent of Police Khadka informed that the road in the area around Ghiukhola and Vishwakarma Mandir in Downne is muddy and slippery and the vehicles are not able to climb uphill and get stuck in the middle of the road.
Express
Related News
A 4-month-old baby died in a landslide in Dolakha, the mother was seriously injured
Dolakha A 4-month-old baby died in a landslide on Sunday night in Kalinchok Rural Municipality-1, Cangpol, Dolakha, while his mother was seriously injured.
According to the police, 19-year-old Sharmila Thami and her 4-month-old daughter Elin...
Chance of rain with thunder in these states
Kathmandu. At present there is a partial influence of western and local winds in Nepal. The hilly areas of the country including Gandaki, Lumbini, Karnali and Sudurpaschim are partly cloudy, while the weather is mainly clear in the rest of the cou...
Double effect of temperature rise and change: rain and snow in some places, increasing heat in some places
Kathmandu. Due to the combined effect of the low pressure system and local winds developed in the upper atmosphere of the western part of the country, the weather is going to change in different parts of the country. Due to this, there is a possib...
Floods and landslides affected life across the country: Two people died in Jajarkot and Dolakha
Kathmandu. Floods and landslides have disrupted life in various parts of the country due to continuous incessant rains. Due to the landslides in the hilly areas, roads have been blocked and human casualties have also occurred, while the floods in...
Preparations to cancel 107 schools by Kathmandu Metropolis, 15 days ultimatum to get in touch
Kathmandu. Kathmandu Metropolitan City has prepared to cancel one hundred and seven schools that are not physically functioning. On Tuesday, the metropolis issued an ultimatum to such schools to contact the education department within 15 days. Acc...
The ministry asked for suggestions to change the number and boundaries of the local level
Kathmandu. The Ministry of Federal Affairs and General Administration has asked for opinions and suggestions on the preliminary draft regarding the number and boundary changes of rural villages, municipalities and wards. The Ministry has sent a le...



