Blocked BP Highway in operation, traffic resumed after clearing landslides and landslides
make it Traffic has resumed on the Kavrepalanchok section under the BP highway, which has been blocked due to incessant rain. After the landslides and mudslides that fell at various places were removed, the highway was reopened this evening. Due to continuous rains on Friday and Saturday, landslides occurred in various sections from Chowkidanda to Nepalthok, and traffic was completely blocked since Saturday morning due to piles of mud and stones on the roads.
According to Ravin Bista, Information Officer and Deputy Superintendent of Police, District Police Office, Kavrepalanchok, since Sunday morning, dozers, security personnel and technical teams were mobilized to remove the landslide.
Express
Related News
Artemis-2 returning with the moon bow
Kathmandu. The Artemis-2 mission carrying four astronauts has returned to Earth after orbiting the Moon. According to Nepali time, on Tuesday morning, the team put on the funko of the moon. In this process, a new record of reaching the farthest di...
Heavy rain forecast in Koshi, Bagmati, Gandaki and Lumbini regions
Kathmandu. At present, the influence of Monsoon air is present across the country. At present, the low pressure line of monsoon is near the Terai area of Nepal a little north of Sardar place. Currently, it is generally cloudy across the country....
Weather Forecast: Possibility of Rain with Thunder and Lightning in Five Provinces
Kathmandu: At present, Nepal is experiencing the combined influence of westerly winds, local winds, and a low-pressure system near the eastern region. Due to this, most parts of the country are cloudy, and there is a possibility of rainfall in som...
The engine of the Turkish Airlines flight from Kathmandu caught fire
Kathmandu. One of the engines of the Turkish Airlines plane flying from Kathmandu's Tribhuvan International Airport to Istanbul, Turkey, caught fire. The plane tried to return after a problem was noticed shortly after take off.
A...
Chief Minister's emergency inspection after Chamema river is blocked, efforts to open it continue
Manang. Gandaki Province Chief Minister Surendra Raj Pandey has visited Chame of Manang to conduct an on-site inspection of the gravel, large stones and blocked river due to the disaster and landslide in Manang.
In this context, a special me...
It will take a week for monsoon to arrive in Nepal
Kathmandu. It will take another week for monsoon to enter Nepal. According to Varun Poudel, senior meteorologist of the Department of Water and Meteorology, the monsoon has now arrived in Kerala and Tamil Nadu in South India and it will take a wee...



