November 7, 2026, Saturday
English

Blocked BP Highway in operation, traffic resumed after clearing landslides and landslides

Main News Image

make it Traffic has resumed on the Kavrepalanchok section under the BP highway, which has been blocked due to incessant rain. After the landslides and mudslides that fell at various places were removed, the highway was reopened this evening. Due to continuous rains on Friday and Saturday, landslides occurred in various sections from Chowkidanda to Nepalthok, and traffic was completely blocked since Saturday morning due to piles of mud and stones on the roads.

According to Ravin Bista, Information Officer and Deputy Superintendent of Police, District Police Office, Kavrepalanchok, since Sunday morning, dozers, security personnel and technical teams were mobilized to remove the landslide.

mediabaaji add

Related News

The water flow at Koshi Barrage is 165,000 cusecs per second, 23 gates open

Inruro. Due to incessant rains in the eastern hilly and Terai districts, the flow of water through the Koshi Barrage in the Koshi River has increased. The water flow through the Koshi Barrage is 1,85,130 cusecs per second.

Sunsari Superinte...