June 28, 2026, Sunday
English

8 billion spent on the north-south road, black paper target up to Korla

Main News Image

Kathmandu. As part of the north-south trade route expansion project, Rs. The project has spent 82 percent of the budget while the proposed cost estimate of the project is Rs 10.57 billion till FY 2081-82.

Under the Korla road of national pride connecting India and China, a 202 km road track has been opened from Maludhunga in the mountain to Nepal-China Korlana. According to the decision of the Council of Ministers on November 12, 2073, Kaligand Corridor 9Beni-Jomsam-Korla road was established as a separate project. Under which the project has been continuously upgrading the roads in Parbat, Myagdi and Mustang sections since 2073 and 74. The last revised completion period of the project has been proposed for the year 2082 and 2083. But since the road up to Korlanaka needs to be paved, it is certain that the completed period will be revised again.

Under this Kaligandaki Corridor road project, the target is to open 202 km of road tracks, 97 km of road gravel, 150 km of tarmac and 19 bridges. According to the target, by the year 2081 and 2082, the project has opened 202 kilometers of road tracks, 94 kilometers of road gravel, 88 kilometers of black paper and construction of 14 bridges have been completed, project chief Tejashwi Sharma has informed.

For Korla road, through the project, 3 km of gravel and 10 km of Kagbeni-Chusang will have to be blacked on 27 km of the road and a new contract will have to be issued for the rest. Under this project, if the 9 Kagbeni-Korla road section is also covered with black, the total cost estimate of the project may be more than 15 billion, according to the head of the project Sharma. According to the head of the project, the goal is to upgrade the road and blacken the entire 202 km double lane of the Korla road section and build the necessary bridge.

mediabaaji add

Related News

New interest rates of commercial banks for the month of November announced, who reduced how much?

Kathmandu. Commercial banks have published new interest rates for the month of November. According to the published information, 10 out of 20 commercial banks have reduced the maximum interest rate of personal term dep...

15 in petrol and Rs 10 in diesel-kerosene

Kathmandu. Nepal Oil Corporation has increased the price of petroleum products. The corporation has increased the price of petrol by Rs 15 and diesel kerosene by Rs 10. After the price hike, petrol in Kathmandu valley has become 172 per liter and...

What is the foreign currency exchange rate for Monday?

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to Rashtra Bank, the buying rate of one US dollar has been fixed at 142 rupees 88 paisa and the selling rate is 143...

Federation President Dhakal's request to take action against those who vandalized and looted during the Genji movement

Kathmandu. Chandra Prasad Dhakal, President of Federation of Nepal Chamber of Commerce and Industry, has said that the Federation is working hard to solve the problems of entrepreneurs, businessmen and the economy. Add...

Jail sentence for those who spread chaos in the banking sector, the National Bank has given a final warning

Kathmandu. Nepal Rastra Bank has said that it has drawn serious attention to the unprofessional and disorderly activities targeting banks and financial institutions and their employees in recent days.

Salary to government employees in 15 days now

Kathmandu. Government employees will now get salary and allowance within 15 days. The Ministry of Finance has issued a circular to provide salaries and allowances to government employees within 15, 15 days by taking a ministerial decision. In the...