June 28, 2026, Sunday
English

8 billion spent on the north-south road, black paper target up to Korla

Main News Image

Kathmandu. As part of the north-south trade route expansion project, Rs. The project has spent 82 percent of the budget while the proposed cost estimate of the project is Rs 10.57 billion till FY 2081-82.

Under the Korla road of national pride connecting India and China, a 202 km road track has been opened from Maludhunga in the mountain to Nepal-China Korlana. According to the decision of the Council of Ministers on November 12, 2073, Kaligand Corridor 9Beni-Jomsam-Korla road was established as a separate project. Under which the project has been continuously upgrading the roads in Parbat, Myagdi and Mustang sections since 2073 and 74. The last revised completion period of the project has been proposed for the year 2082 and 2083. But since the road up to Korlanaka needs to be paved, it is certain that the completed period will be revised again.

Under this Kaligandaki Corridor road project, the target is to open 202 km of road tracks, 97 km of road gravel, 150 km of tarmac and 19 bridges. According to the target, by the year 2081 and 2082, the project has opened 202 kilometers of road tracks, 94 kilometers of road gravel, 88 kilometers of black paper and construction of 14 bridges have been completed, project chief Tejashwi Sharma has informed.

For Korla road, through the project, 3 km of gravel and 10 km of Kagbeni-Chusang will have to be blacked on 27 km of the road and a new contract will have to be issued for the rest. Under this project, if the 9 Kagbeni-Korla road section is also covered with black, the total cost estimate of the project may be more than 15 billion, according to the head of the project Sharma. According to the head of the project, the goal is to upgrade the road and blacken the entire 202 km double lane of the Korla road section and build the necessary bridge.

mediabaaji add

Related News

Petrol and diesel prices stable

Kathmandu. Nepal Oil Corporation has decided to continue the retail sale price of petroleum products. Despite receiving the new purchase price from Indian Oil Corporation (IOC), the Board of Directors' meeting held on Monday decided not to change...

Expanding energy cooperation between Nepal and Bangladesh

Kathmandu. Bangladesh has agreed to take an additional 20 MW of electricity from Nepal. The seventh meeting of the Energy Secretary-level joint directorate committee of Nepal and Bangladesh held on Thursday has agreed...

What is the exchange rate of which foreign currency on Thursday?

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the fixed exchange rate, the buying rate of one US dollar is 144 rupees 18 paisa and the selling rate is 144 rupees 78 paisa. Similarly, the...

National Life gave 1 day training to the agents of Koshi region

Kathmandu. National Life Insurance Company Ltd. has provided 1 day training to the group of agents who have been working in different branch offices in Koshi province. International trainer Syed Alfaz Ahmed provided training to 120 agents who were...

Normal point increase in NEPSE, turnover fell to 3.42 billion

Kathmandu. On the third trading day of the week, the NEPSE index increased by 3.27 points to 2584.49. During the day, 7668 thousand 915 shares of 328 companies were bought and sold. Today, while the share price of 134 companies increased, the shar...

An increase of 15.70 points in NEPSE, a turnover of 4 billion 10 crores

Kathmandu. On the third trading day of the week, NEPSE index increased by 15.70 points to 2566.07. During the day, 92 lakh 55 thousand 457 shares of 345 companies were bought and sold, and over 4.1 billion shares were...