June 28, 2026, Sunday
English

8 billion spent on the north-south road, black paper target up to Korla

Main News Image

Kathmandu. As part of the north-south trade route expansion project, Rs. The project has spent 82 percent of the budget while the proposed cost estimate of the project is Rs 10.57 billion till FY 2081-82.

Under the Korla road of national pride connecting India and China, a 202 km road track has been opened from Maludhunga in the mountain to Nepal-China Korlana. According to the decision of the Council of Ministers on November 12, 2073, Kaligand Corridor 9Beni-Jomsam-Korla road was established as a separate project. Under which the project has been continuously upgrading the roads in Parbat, Myagdi and Mustang sections since 2073 and 74. The last revised completion period of the project has been proposed for the year 2082 and 2083. But since the road up to Korlanaka needs to be paved, it is certain that the completed period will be revised again.

Under this Kaligandaki Corridor road project, the target is to open 202 km of road tracks, 97 km of road gravel, 150 km of tarmac and 19 bridges. According to the target, by the year 2081 and 2082, the project has opened 202 kilometers of road tracks, 94 kilometers of road gravel, 88 kilometers of black paper and construction of 14 bridges have been completed, project chief Tejashwi Sharma has informed.

For Korla road, through the project, 3 km of gravel and 10 km of Kagbeni-Chusang will have to be blacked on 27 km of the road and a new contract will have to be issued for the rest. Under this project, if the 9 Kagbeni-Korla road section is also covered with black, the total cost estimate of the project may be more than 15 billion, according to the head of the project Sharma. According to the head of the project, the goal is to upgrade the road and blacken the entire 202 km double lane of the Korla road section and build the necessary bridge.

mediabaaji add

Related News

The price of the US dollar, Australian dollar, euro and pound increased!

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currencies for Saturday. Today, the value of all foreign currencies including US Dollar, Australian Dollar, Euro, Pound, Kuwaiti and Bahraini Dinar has increased. According t...

Narayanghat-Butwal road: All the bridges in the eastern section have been completed

Nawalparasi All the bridges on the eastern section of the Narayanghat-Butwal road section, which the government has taken forward as a national pride, have been completed. Narayanghat-Butwal Road Plan Eastern Section has informed that 33 out of 34...

The US dollar, UK pound sterling and Swiss franc rose

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the fixed exchange rate, the value of the US dollar, UK pound sterling and Swiss franc has increased today. The buying rate of one American d...

Preparing to blacklist these 15 construction companies

Kathmandu. The Public Procurement Monitoring Office under the Prime Minister's Office has initiated the process of blacklisting 15 construction companies. 

The office has issued a notification today and has asked the construction compan...

This week, NEPSE has decreased by normal numbers, how much is the transaction on which day?

Kathmandu. This week, NEPSE index decreased by 0.56 points and reached 2714.05 points. NEPSE, which closed at 2714.61 points last week, decreased by 73.18 points to 2714.05 points this week. The market was open for five trading days this week. In...

An increase of 5.32 points in NEPSE, the turnover fell to 5.82 billion

Kathmandu. On the third trading day of the week, NEPSE index increased by 5.32 points to 2655.99. During the day, 1976,780 shares of 319 companies were bought and sold, and over 5.82 billion shares were traded. Today,...