August 28, 2026, Friday
English

The road construction of the southern section is in the final stage

Main News Image

Kathmandu. The construction work of the southern road section under the East-West highway has reached its final stage. The project claims that the concrete slope in this section will last for at least 30 years. According to Chudaraj Dhakal, project director of ADB's project directorate under the road department, keeping in mind the geological structure of the valley, the risk of landslides and the increasing traffic volume, concrete slope technology has been adopted instead of asphalt.

He said that if the construction of the road is done according to the design and the standards including load control are implemented effectively, the life of the slope can reach up to 40 years. He expressed the belief that this will end the suffering of the commuters on the lower section of the road for years.

According to Dhakal, the carrying capacity of the road has been determined up to 10 tons on a single wheel. He said that the road has been designed based on the traffic volume of the next 20 to 30 years and that even if 12,000 to 20,000 vehicles operate daily, the structure of the road will not be affected.

mediabaaji add

Related News

2 youths riding a motorcycle were killed when they were hit by a vehicle with no number plate

Kathmandu. Two youths have died in a road accident in Hetauda of Makwanpur. The police said that two youths were killed when a vehicle with an undisclosed number hit a motorcycle numbered Na 43 P 221 in Hetaunda sub-metropolitan city 19 Bastipur.&...

Two thousand Nepalis in crisis in Portugal

Kathmandu. Hundreds of Nepali who are working in Portugal are facing a serious legal crisis due to fake certification fake stamp case. After it was confirmed that fake seals and signatures of the Portuguese and Nepalese embassies in Delhi were use...

All the vehicles parked at the gate of the media house were abandoned by the police

Kathmandu. All the vehicles parked at the gates of various media offices have been handed over by the police to the concerned persons. On Monday morning, Kantipur Publication, Online Khabar, Himalayan Television, Congress President Gagan Thapa's h...

The epicenter of the earthquake was Saipal

Bajura. An earthquake has occurred around Saipal in Bajhang. Earthquake measuring center Surkhet reported that an earthquake measuring 4.4 on the Richter scale occurred at 12:09 PM on Sunday with its epicenter at Saipa...

Tipper accident in Jorte uphill, the driver died when he fell 250 meters!

Palpa. One person died in a tipper accident this morning at Jorte Ukalo in Riddhikot rural municipality-2 of Palpa. According to the police, the tipper No. 8 Kha 365, which was going to Gulmi from Palpa Cement Industry in Nawalparasi, fell down ab...

Swasthani fasting story is being concluded today

Kathmandu. On the day of Magh Shukla Purnima, a month-long Swasthani fasting story is being concluded today. The month-long fast started by Vedic Sanatan Hindus at home from Paush Shukla Purnima is going to be formally concluded today. Devotees fr...