August 28, 2026, Friday
English

The road construction of the southern section is in the final stage

Main News Image

Kathmandu. The construction work of the southern road section under the East-West highway has reached its final stage. The project claims that the concrete slope in this section will last for at least 30 years. According to Chudaraj Dhakal, project director of ADB's project directorate under the road department, keeping in mind the geological structure of the valley, the risk of landslides and the increasing traffic volume, concrete slope technology has been adopted instead of asphalt.

He said that if the construction of the road is done according to the design and the standards including load control are implemented effectively, the life of the slope can reach up to 40 years. He expressed the belief that this will end the suffering of the commuters on the lower section of the road for years.

According to Dhakal, the carrying capacity of the road has been determined up to 10 tons on a single wheel. He said that the road has been designed based on the traffic volume of the next 20 to 30 years and that even if 12,000 to 20,000 vehicles operate daily, the structure of the road will not be affected.

mediabaaji add

Related News

Installation of sanitary pad distribution machines in schools

Bhojpur. Ramprasad Rai Rural Municipality of Bhojpur has started installing automatic 'sanitary pad' distribution machines in schools targeting the health and convenience of female students. The machine has been instal...

The influence of western wind remains: How was the weather across the country on Monday?

Kathmandu. According to the Department of Water and Meteorology, there is a possibility of light rain in some hilly and mountainous areas due to the influence of western winds in Nepal. According to the department, it...

A bird struck a Buddha Air plane

Pokhara. A bird has hit a Buddha Air plane that came from Kathmandu to Pokhara. Buddha Air Pokhara station manager Gautam Baral informed that a bird collided with the plane during landing at Pokhara airport today at 3:45 p.m.

He informed t...

Youth from Tanahun missing in Portugal, request of the family to search

Kathmandu. A Nepali youth who came to Portugal for foreign employment has gone missing. 34-year-old Jitendra Pandey, who lives in Pipalpani, Tanahun, Bhanu Municipality-9, and has been living in Portugal for the past t...

Courtesy call between Inspector General of Police Karki and Commander-in-Chief Sigdel

Kathmandu. Inspector General of Police Dan Bahadur Karki has met with Commander-in-Chief Ashokraj Sigdel. According to the Nepal Police, Inspector General Karki visited the Bhadrakali military base of the Nepalese Army on Friday. Nepal Police has...

14 injured when truck and bus collided

Kathmandu. 14 people were injured when a truck loaded with rice and a passenger bus collided in Makwanpur on Thursday. The accident occurred when a rice load truck No. BAPR 06001 B 0415 and a passenger bus No. BPA 101001 B 4768 coming from the opp...