The road construction of the southern section is in the final stage
Kathmandu. The construction work of the southern road section under the East-West highway has reached its final stage. The project claims that the concrete slope in this section will last for at least 30 years. According to Chudaraj Dhakal, project director of ADB's project directorate under the road department, keeping in mind the geological structure of the valley, the risk of landslides and the increasing traffic volume, concrete slope technology has been adopted instead of asphalt.
He said that if the construction of the road is done according to the design and the standards including load control are implemented effectively, the life of the slope can reach up to 40 years. He expressed the belief that this will end the suffering of the commuters on the lower section of the road for years.
According to Dhakal, the carrying capacity of the road has been determined up to 10 tons on a single wheel. He said that the road has been designed based on the traffic volume of the next 20 to 30 years and that even if 12,000 to 20,000 vehicles operate daily, the structure of the road will not be affected.
Express
Related News
The Commission of Inquiry asked IGP Khapung for a 24-hour explanation
Kathmandu. The Genji Movement Investigation Commission has asked the Inspector General of Nepal Police IGP Chandrakuver Khapung for an explanation within 24 hours. He has been asked to give an explanation within 24 hou...
Restoring an ancient statue of Shakyamuni Buddha brought back from America
Kathmandu. A 13th-century Shakyamuni Buddha statue that was smuggled into the United States by thieves has been duly restored at the local Nhuchchewal.
Recently, the statue has been restored there in coordination with Kathmandu Metropolitan...
The baby who was sent home as dead by Veri Hospital is alive, the hospital has apologized
Kathmandu. It has been revealed that the Bheri Hospital in Nepalganj, Banke sent the baby home alive as dead. According to the incident report, a pregnant woman who was admitted to the labor ward of the hospital on November 25 gave birth to a baby...
Two people died in a motorcycle accident
Bagmati. Two people have died in a motorcycle accident at the Bundalkhola Bridge on the border of Makwanpurgarhi Rural Municipality-5 and Bhimfedi Rural Municipality-1 in Makwanpur. According to Makwanpur District Poli...
5 dead, 3 injured after truck overturns in Sunsari
Kathmandu. 5 people were killed when a truck number 1K 4541 carrying marble from Biratnagar to Rajviraj overturned on Hulaki Highway under Bhokrah Narsingh Rural Municipality of Sunsari this morning. Three others were injured in the accident.
<...Madhyapahari Lokmarg: Upgradation of Harichok-Yamdi section of Pokhara is in final stage
Kaski. Every day, hundreds of passenger and cargo vehicles leave and enter the western part of the country from Pokhara through the Pokhara section of Madhyapahari Pushpalal Highway. The National Pride National Highway...


