October 14, 2026, Wednesday
English

Rasuwa floods blocked vehicles going to four districts in Kathmandu

Main News Image

Kathmandu. After a big flood and landslide in Rasuwa, the traffic police stopped the vehicles going to four districts in Kathmandu. SP Nareshraj Subedi of the Kathmandu Valley Traffic Police Office said that vehicles going from Kathmandu to Rasuwa, Nuwakot, Chitwan and Dhading were stopped in Kathmandu.

In view of the flood, the vehicles going to those districts were stopped in Kathmandu.

mediabaaji add

Related News

The country received 1 billion 19 million from the Carbon Sharing Fund

Kathmandu. After succeeding in reducing about 18 lakh 88 thousand tons of carbon dioxide emissions through the 'REDD Plus' emission reduction program under the Terai Arch region, the country has received one billion 19...

Preparations for Chhath festival have started, pond ghats are being decorated

Janakpur. With the end of Tihar, preparations for Chhath festival have started in Terai Madhesh along with Janakpurdham. The ponds and ghats of Janakpurdham are being decorated for Chhath, which is celebrated with gran...

Increasing attraction of tourists in Pathibhara, offerings are increasing

Elam. In the Pathibhara temple located in Kutidanda, Rong Rural Municipality-3 of Ilam, Rs.4 crore 23 lakh 68 thousand 854 offerings, 13 tolas 45 annas of gold and 609 tolas 57 annas of silver have been collected in three years. Krishna Kumari Bhu...

Risk of flooding in the river coastal areas of Kathmandu: Request not to use corridor roads

Kathmandu. As the water flow in the main rivers of Kathmandu Valley is high due to continuous rains, the security agencies have increased vigilance in the river coastal areas and corridors keeping in mind the possible risk.

According to the...

After the introduction of urban culture, the originality of the village started to disappear

Baglung. There are few rural areas in Baglung that are not connected by roads. Some villages are in the process of being connected. After being connected by roads, the rural areas are gradually developing, but the orig...

Bhotekoshi flood: It is estimated that 95 billion will be spent to remove and manage the debris

Kathmandu. It is estimated that more than 95.42 billion rupees will be spent to remove the stones, mud, sand and building debris accumulated due to the flood in the Bhotekoshi river and for immediate and long-term restoration. This data was releas...