November 14, 2026, Saturday
English

Muglin -Malekhu road upgradation work started

Main News Image

Kathmandu. The work of upgrading the Muglin-Malekhu road, which was only a normal work due to the rainy season, has started gaining intensity. After June, the road upgrading work slowed down. After the rain stopped and the festival was over, the work started to be intensified. According to Vijay Darai, engineer of the western section of the Muglin-Malekhu road under the Nagdhunga-Muglin road project, the work has been accelerated. The work on the access road to the bridge has been started. The access roads of four bridges are going to be constructed. Barrier work has been started on the bridge and other parts and drain work has also been started.

According to him, preparations have been made to start the black paper work in two to three days. Out of 38.86 kilometers of that section, eight kilometers of roads have been paved. Final preparations have been made for additional five kilometers of road blacking. According to Darai, the place where the final preparations have been made is about to be blacked out. Along with this, preparation work will be done for the black paper in other places. Among the other two bridges on that road section, one foundation of Charoodi Khol bridge has been laid. On the other hand, both the foundations of the Hoogdi river bridge have been prepared.

According to Darai, 35 percent of road upgrading has been completed so far. In this section, 2.2 km will be six-lane, which will be in Malekhu, Benighat and Muglin sections. The 7.2 km road will have four lanes. Stating that the four lanes will be in the areas of Danda, Kurintar, Fisling, Chumling, Mazhimtar, Charaudi and Vishaltar, Darai said that a three-lane 'climbing' route will be made in the uphill and downhill sections. According to him, the 'climbing' route will be 2.3 km and the rest of the road will be two lanes.

This road was contracted to be completed in three years on 15 January 2079. Under the Prithvi highway, Muglin-Nagdhunga section has been divided into three phases and bids have been invited. This falls under the third phase. It will expire on the 15th of January. Darai said that the process for extending the deadline has gone ahead. He said that the construction company will get an extension of a few months due to design modification etc.

mediabaaji add

Related News

After a week, the stock market fell, the turnover did not increase

Kathmandu. The stock market, which has increased for 6 consecutive trading days, fell by 13.95 points on Wednesday and the NEPSE index fell to 2,712 points. The transaction amount has also decreased from 6.67 billion rupees the previous day to 5.1...

Formation of a 7-member high-level committee by the government to conduct a scientific study of the Bhotekoshi disaster

Kathmandu. The government has formed a seven-member expert study committee to find the real scientific basis and evidence of the disastrous flood in Bhotekoshi river in Rasuwa. The Ministry of Energy, Water Resources and Irrigation formed the high...

The price of gold and silver decreased, how much per tola?

Kathmandu. On Thursday, the price of gold and silver decreased in the Nepalese market. According to the Federation of Nepal Gold and Silver Traders, today the price of gold has decreased by 800 rupees per tola. Along w...

The price of gold increased by 5400 rupees per tola in one day, at what price is it going to be bought and sold today?

Kathmandu. Even today, the price of gold and silver has increased in Nepali market. On Tuesday, the price of gold increased by one thousand rupees per tola, on this day it increased by five thousand four hundred rupees per tola. According to the F...

Saturday's exchange rate, the value of the dollar and the currencies of the Gulf countries

Kathmandu. Nepal Rastra Bank has determined the official exchange rate of foreign currencies for Saturday. According to the Central Bank, today the buying rate of one US dollar has remained at 150 rupees 74 paisa and the selling rate has remained...

Double-digit growth in NEPSE, turnover limited to 3 billion 29 million

Kathmandu. On the second trading day of the week, the NEPSE index increased by 16.37 points to 2619.99. During the day, 78 lakh 4 thousand 45 shares of 325 companies were bought and sold, and 3 billion 294 million shar...