Krishnabhir Landslide: Temporary track to be opened within 15 days, appeal to use alternate route
Kathmandu. Muglin Naubise section of Prithvi Highway has been completely blocked due to a huge landslide in Krishnabhir in Dhading. After Trishuli river eroded the land under the road, the vehicles going to West Nepal including Chitwan, Tanahun, Kaski via Kathmandu and Dhading were stranded.
After the highway was blocked, the road department has requested to use Tribhuvan Rajpath and Kanti Rajpath as alternative routes for the time being.
According to Deputy Director General and Spokesperson of the Road Department, Shubraj Neupane, although the road is somewhat narrow, even large vehicles can be operated from the Tribhuvan Rajpath.
Express
Related News
Monsoon continues to affect the country, heavy rain is likely in these four states today
Kathmandu. According to the Weather Forecast Division, the influence of Monsoon air is present across the country. At present, the low pressure line of monsoon is around Sardar place. The effect of which is generally clouded across the country. Li...
Cloudy with rain at some places in the Himalayan regions of Koshi, Bagmati and Gandaki
Kathmandu. At present, there is an influence of western low pressure system and local air in Nepal, according to the weather forecast department. According to the department, it will be generally cloudy in the Himalayan areas of Koshi, Bagmati and...
Preparations to cancel 107 schools by Kathmandu Metropolis, 15 days ultimatum to get in touch
Kathmandu. Kathmandu Metropolitan City has prepared to cancel one hundred and seven schools that are not physically functioning. On Tuesday, the metropolis issued an ultimatum to such schools to contact the education department within 15 days. Acc...
Impact of westerly and local winds across the country: Chance of rain and snow
Kathmandu. At present, there is a general change in the weather in Nepal due to the partial influence of western and local winds. According to the Department of Hydrology and Meteorology, it is generally cloudy in the mountainous areas of the coun...
The result of SEE will be announced by 29 Baisakh
Kathmandu. The National Examination Board is doing the entry work to publish the results of the Secondary Education Examination SEE within 1 month. The board has prepared to announce the results within 29 Baisakh. According to the Controller...
Chance of light snowfall in Himalayan region and storm in some places of Terai
Kathmandu. According to the Weather Forecasting Division, today there will be a normal change in the hilly and Himalayan regions of Koshi Province and other Himalayan regions. It is expected that the weather will be mainly clear in the terai regio...



