Heavy damage to power sector due to Bhotekoshi flood, 12 projects of 431 MW closed
Kathmandu. About 10 percent of the country's total power generation capacity has been affected due to the floods in the Bhotekoshi River in Rasuwa. After the floods caused great damage to power generation, transmission and distribution structures, power supply management has become a challenge.
According to Viraj Bhakta Shrestha, Minister of Energy, Water Resources and Irrigation, Nepal Electricity Authority is working with high priority to maintain balance between electricity demand and supply. Although the authority has succeeded in keeping the electricity system balanced so far, the necessary preparations have been intensified as there may be more challenges in the future due to the heavy damage caused by the flood.
According to preliminary information, 12 power generation stations with a capacity of 431.1 megawatts have been shut down due to floods and have been disconnected from the power system. Similarly, Minister Shrestha has informed that preliminary information has been received that 15 hydropower projects under construction with a total capacity of 470 megawatts have been damaged.
Express
Related News
Bagmati public transport fare hiked: Minimum fare Rs 24
Kathmandu. The Bagmati state government has adjusted the fares of public vehicles running on petrol and diesel. The new rate has been determined through the decision of the Minister of Labour, Employment and Transport on Friday. The new fare has b...
Fuel prices have increased, but retail prices in Nepal remain the same
Kathmandu. Despite the increase in the price of petroleum products from the Indian Oil Corporation, the Nepal Oil Corporation has decided not to increase the retail price keeping in mind the convenience of the general public. According to the new...
The economy size has 61 trillion seven billion, growth 4.61 percent
In the last Fiscal Year 2081/82, Nepal's economic growth rate is equal to four decimals and the size of the economy 61.20 billion.
Seventeen lakh farmers will be listed
Kathmandu. The Ministry of Agriculture and Livestock Development will soon list about 1.7 lakh farmers who are yet to be listed. At the local and regional level, 1.737 thousand farmers were yet to be listed due to some technical reasons including...
Treatment of three crore 2.4 million liters of waste water daily from Guhyeshwari sewage treatment plant
Kathmandu. The Guhyeshwari sewage treatment plant located in Guhyeshwari district is processing 30 million 24 lakh liters of waste water daily. In order to keep the rivers and environment of Kathmandu Valley clean, construction of more treatment c...
The upcoming budget will focus on economic transformation: Finance Minister Dr Wagle
Kathmandu. Finance Minister Dr Swarnim Wagle has said that the budget to be presented on May 15 will focus on economic transformation. Finance Minister Wagle clarified the government's opinion on the current economic, political and contemporary is...



