Financial management of Tila 1 hydropower project led by NMB Bank
Kathmandu. NMB Bank Limited has successfully completed the financial management as the lead bank for the Tila 1 Hydropower Project located in Calikot district with a capacity of 440 MW according to the production permit. Promoted by SC Power Company Pvt Ltd, this project is being constructed in Tila Khola and its total estimated cost is 59.4 billion rupees. Out of the total cost, the Consortium Cofinancing Group of Banks will provide term loans worth Rs 44.55 billion.
In this financial management, NMB Bank Limited is the lead bank, while Global IME Bank Limited, Himalayan Bank Limited and Prabhu Bank Limited are the co-lead banks. Besides, other banks and financial institutions are also involved as member banks.
This agreement was signed by Mr. Dinesh Dulal, Assistant General Manager on behalf of NMB Bank Limited and Ms. Susan Karmacharya, President on behalf of SC Power Company Pvt Ltd. Based on the installed capacity, this is the largest hydropower project developed by the private sector so far. SC Power Company Pvt Ltd is headed by Ms. Susan Karmacharya and her group. According to the power purchase agreement of this 440 MW project, the designated year of commercial operation is December 31, 2030. In the first year of operation, it is estimated that this project will generate revenue equal to 11.4 billion rupees.
Express
Related News
Foreign currency exchange rates: what is the value of dollars, euros and pounds?
Kathmandu. Nepal Rastra Bank has set the official exchange rate of foreign currency for today. According to Rashtra Bank, the buying rate of one US dollar has been fixed at 152 rupees 39 paisa and the selling rate has been fixed at 152 rupees 99 p...
Yeti Brewery to issue IPO through book building method
Kathmandu. Yeti Brewery Limited has called a special general meeting at the registered office in Naxal at 11 am on Saturday 2nd June with the proposal to issue IPO through book building method.
The meeting will pass a resolution to conduct t...
The value of the US dollar increased!
Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the exchange rate set for today, the value of the US dollar has increased again. According to the determined exchange rate, the buying rate o...
Adding date of commercial production of hydropower projects
Kathmandu. The Nepal Electricity Authority has prepared to add RCOD to the final date for starting commercial production of hydropower projects that have not been able to start commercial production due to various reasons despite the PPA.
Th...
Juice production after kiwis are not sold
Baglung. The women of Tarakhola rural municipality have started producing kiwi juice. Five years ago, women planted kiwis all over the fields in the village hoping to sell them at a high price, but now they are unable to find a market, so they hav...
Emphasis on Nepal-China economic cooperation
Kathmandu. Finance Minister Rameshwar Khanal emphasized on Nepal-China economic cooperation and investment growth. In a workshop on Nepal-China economic cooperation and investment held here on Tuesday, Minister Khanal...



