Electricity generation started from Setikhola project
Kaski. Setikhola hydropower project of 22 megawatt capacity, completed in Pokhara Metropolitan City-33 of Kaski, has started generating electricity. The project promoted by Seti Khola Hydropower Limited started in December 2078.
After the inspection and testing of the project by the technical team of the Nepal Electricity Authority, the produced electricity has started to flow in the national transmission system as a test, according to Deepak Baral, the director of the promoter company.
According to him, initially 15 days will be in the project trial period. After that, regular commercial production will begin. During that period, the electricity produced will be transferred to the Nepal Electricity Authority's system, while technical testing of the project and equipment will be conducted.
Express
Related News
Shikhar Power Development Limited releasing IPO for general public from February 17th
Kathmandu. Shikhar Power Development Limited is going to open the initial public issue IPO from February 17. The company has announced that it is going to issue a total of 18 lakh 42 thousand 600 ordinary shares to the general public. Out of the t...
What is the exchange rate of which foreign currency on Monday?
Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the fixed exchange rate, the buying rate of one US dollar is 148 rupees 39 paisa and the selling rate is 148 rupees 99 paisa. Similarly, the...
The price of gold continues to rise, how much did it reach per tola on Monday?
Kathmandu. The price of gold in the Nepalese market is constantly on the rise. Today only gold has increased by 1 thousand 900 rupees. According to the Nepal Gold and Silver Traders Federation, gold is being traded at...
5 lakh more income in one year from flower farming
Walling. Tulsiram Bhandari of Chapakot Municipality-1 Chowghera in Syangja has been earning five lakhs more in a year from commercial flower farming. He, who is also a former teacher, has been cultivating flowers targeting Dasain and Tihar.
<...26 years after the Baglung connecting track was opened, the road was blacked out
Baglung. After 26 years of the opening of the 'track', the locals are happy that the rural roads have been turned black. Mulpani-Titaure, Odarchaur-Dhodeni and Ganeshghumti-Nirayaghat roads connected to the district headquarters have been bl...
Commission's request not to follow the illusion of giving land illegally
left Lanz Problem Solution Commission District Committee Banke has requested not to follow the rumors and confusion that the land will be given in an unauthorized manner. Ghannath Khanal, chairman of the District Committee of the Land Problem Solu...



