Electricity generation started from Setikhola project
Kaski. Setikhola hydropower project of 22 megawatt capacity, completed in Pokhara Metropolitan City-33 of Kaski, has started generating electricity. The project promoted by Seti Khola Hydropower Limited started in December 2078.
After the inspection and testing of the project by the technical team of the Nepal Electricity Authority, the produced electricity has started to flow in the national transmission system as a test, according to Deepak Baral, the director of the promoter company.
According to him, initially 15 days will be in the project trial period. After that, regular commercial production will begin. During that period, the electricity produced will be transferred to the Nepal Electricity Authority's system, while technical testing of the project and equipment will be conducted.
Express
Related News
What is the exchange rate of which foreign currency on Wednesday?
Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the fixed exchange rate, the buying rate of one US dollar is 143 rupees 97 paisa and the selling rate is 144 rupees 57 paisa. Similarly, the...
The value of the US dollar is at an all-time high
Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the fixed exchange rate, the value of the US dollar has reached its highest point so far. According to the excha...
Here is the foreign currency exchange rate for today
Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the National Bank, the buying rate of one US dollar is 141 rupees 49 paisa and the selling rate is 142 rupees 09...
On the first day of the week, the stock market fell by 105 points, trading at 12.38 billion
Kathmandu. On Sunday, the stock market index closed flat. Today, the stock market has experienced a century-long fall. Today, NEPSE index decreased by 105.50 points and reached 2676.68 points. This is 3.79 percent less than the previous transactio...
20.75 points decline in NEPSE, turnover of 8.36 billion
Kathmandu. On the second trading day of the week, the NEPSE index decreased by 20.75 points to 2642.15. During the day, 25 million 559 thousand 55 shares of 354 companies were bought and sold, and 8 billion 36 million 44 million shares were traded...
Himali Hydro Fund convened a general meeting to pass the IPO proposal
Kathmandu. Himali Hydro Fund Limited is going to issue an IPO. The company has called the fourth general meeting to pass the IPO issue proposal. The meeting of the company will start from 10 am at the registered office of the company in Kathmandu...


