July 9, 2026, Thursday
English

Electricity generation started from Setikhola project

Main News Image

Kaski. Setikhola hydropower project of 22 megawatt capacity, completed in Pokhara Metropolitan City-33 of Kaski, has started generating electricity. The project promoted by Seti Khola Hydropower Limited started in December 2078.

After the inspection and testing of the project by the technical team of the Nepal Electricity Authority, the produced electricity has started to flow in the national transmission system as a test, according to Deepak Baral, the director of the promoter company.

According to him, initially 15 days will be in the project trial period. After that, regular commercial production will begin. During that period, the electricity produced will be transferred to the Nepal Electricity Authority's system, while technical testing of the project and equipment will be conducted.

mediabaaji add

Related News

Heavy fall in the price of gold and silver, how much per tola on Thursday?

Kathmandu. Even today, the price of gold is falling in the Nepali market. The gold tola has dropped by five thousand 200 rupees. According to the Nepal Gold and Silver Traders Federation, gold is being bought and sold at 278,300 rupees per tola to...

The process of breaking the sick contracts of roads and bridges has started, 17 contracts are being broken

Kathmandu. The process of canceling the contracts for the construction of roads and bridges, which have been stalled for years due to lack of work, has started.
Under the Road Department, Postal Road Directorate, Federal Road Supervision and...

What is the exchange rate of which foreign currency on Sunday?

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the determined exchange rate, the buying rate of one US dollar is 146 rupees 81 paisa and the selling rate is 147 rupees 41 paisa. Similarly,...

Resumption of interest subsidy on subsidized loans, payment of Rs. 10.58 billion by Rashtra Bank

Kathmandu. Nepal Rastra Bank has paid 10.58 billion rupees to 50 banks and financial institutions for concessional loan interest subsidy. The government has resumed the payment of the subsidy, which was stopped due to the abuse of concessional loa...

What is the exchange rate of which foreign currency on Sunday?

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the determined exchange rate, the buying rate of one US dollar is 145 rupees 28 paisa and the selling rate is 145 rupees 88 paisa. Similarly,...

Revenue collection of 21 lakh 10 thousand in one day in traffic action

Kathmandu. In the past 24 hours, two thousand 102 motorists have been prosecuted for violating traffic rules. From this, the revenue of Rs 21 lakh 10 thousand 514 has been deposited in the state treasury. According to the Kathmandu Valley Traffic...