September 3, 2026, Thursday
English

Electricity generation started from Setikhola project

Main News Image

Kaski. Setikhola hydropower project of 22 megawatt capacity, completed in Pokhara Metropolitan City-33 of Kaski, has started generating electricity. The project promoted by Seti Khola Hydropower Limited started in December 2078.

After the inspection and testing of the project by the technical team of the Nepal Electricity Authority, the produced electricity has started to flow in the national transmission system as a test, according to Deepak Baral, the director of the promoter company.

According to him, initially 15 days will be in the project trial period. After that, regular commercial production will begin. During that period, the electricity produced will be transferred to the Nepal Electricity Authority's system, while technical testing of the project and equipment will be conducted.

mediabaaji add

Related News

73,000 shares of founder shares of Himalayan Bank for sale

Kathmandu. Himalayan Bank Limited has put a total of 73 thousand 69.66 shares of founder shares owned by five founder shareholders for sale. 

The bank has sold 20 thousand 482.08 shares of shareholder Jeet Kumar Shrestha, 20 thousand 29...

What is the exchange rate of which foreign currency on Thursday?

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to Rashtra Bank, the buying rate of one US dollar has been fixed at 145 rupees 22 paisa and the selling rate is 145 rupees 82 paisa. Similarly,...

High increase in gold prices, how much per tola on Friday?

Kathmandu. The price of gold has increased in Nepali market today. Gold tola increased by 5 thousand 300 rupees. According to the Nepal Gold and Silver Traders Federation, gold is being bought and sold at 292,000 rupees per tola today.

On th...

The price of gold and silver in the Nepalese market fell sharply, gold decreased by 8,200 tolas

Kathmandu. In the Nepalese gold and silver market, the price of both gold and silver has fallen significantly on Sunday. According to the information released by the Nepal Gold and Silver Traders Federation, on the first trading day of the week, t...

The market is full of people for Janaipurnima!

Kathmandu. Aiming at Janaipurnima, which falls on 12th of August, jaai are kept for sale in the market. For Janaipurnima, various shapes and types of janai are decorated in shops.

Heavy damage to power sector due to Bhotekoshi flood, 12 projects of 431 MW closed

Kathmandu. About 10 percent of the country's total power generation capacity has been affected due to the floods in the Bhotekoshi River in Rasuwa. After the floods caused great damage to power generation, transmission and distribution structures,...