October 23, 2026, Friday
English

Damage of one billion on Beni-Jomsom-Korla road due to monsoon disaster, reconstruction will cost up to 4 billion

Main News Image

Myagdi. Due to the latest monsoon disaster, the Beni-Jomsom-Korla road of strategic importance connecting China and India has been damaged to the physical structure worth about 1 billion rupees. It is initially estimated that a budget of 3 to 4 billion rupees will be required to restore this road, which was damaged due to the landslides and the flooding and erosion of the Kaligandaki river after the incessant rains of the second week of last October.

According to the Beni-Jomsom-Korla road plan, the flood of Kaligandaki has washed away roads in 10 places and landslides have damaged more than 50 places. According to the project head, Tejashwi Sharma, even if the damaged road costing around 80 to 90 million rupees is temporarily repaired and put into operation within 2 weeks, a large budget is required for sustainable reconstruction. "In addition to landslide and river control, the Myagdi section now has to work according to the design of the asphalt pitch," said Sharma.

mediabaaji add

Related News

Fourth extension of Pokhara-Muglin road project

Kaski. Pokhara-Muglin road upgrading project has been extended for the fourth time. After the deadline extended for the third time has passed, the project has been given the final deadline till the 10th of November.

According to Krishna Baha...

The selling rate of the dollar is 153 rupees 52 paisa, what is the price of the currency of the Gulf countries?

Kathmandu. Nepal Rastra Bank has determined the official exchange rate of foreign currencies for Friday. According to the information released by the Central Bank, today the buying rate of one US dollar is 152 rupees 92 paisa and the selling rate...

Authority reviewing electricity tariffs: Preparation to reduce tariffs and increase domestic consumption

Kathmandu. Nepal Electricity Authority has started the review process with the aim of making the electricity tariff structure timely. With the goal of maximum utilization of electricity, expansion of internal consumption and development of consume...

65 crore worth of agricultural products in Parbat

the mountain In Parbat, which is becoming self-sufficient in food and vegetables, more than Rs. In the financial year 2081 and 2082, the volume of agricultural products produced by giving priority to the six main crops was traded. According to Par...

Foreign currency exchange rate announced: what is the price of dollar, euro and pound?

Kathmandu. Nepal Rastra Bank has determined the official exchange rate of foreign currency for today. According to the information released by the Central Bank, today the buying rate of one US dollar is 152 rupees 04 paisa and the selling rate is...

Support price of paddy: price per quintal is 36 hundred and 60 rupees

Kathmandu. The government has taken a positive decision to fix the minimum support price of paddy for the next financial year before planting paddy. The cabinet meeting held on Monday approved the proposal of the Ministry of Agriculture, Forestry...