Construction contracts will be terminated with businessmen who cannot work on time: Minister Ghising
Chandrapur. Physical Infrastructure and Transport, Urban Development and Energy Minister Kulman Ghising has warned that if the infrastructure construction is not completed on time, the contract with the contractor of the construction company will be terminated. While monitoring the abandoned bridge in Chandinadi located in Chandrapur Municipality-3 of Rautahat today, he stressed that the contractor should complete the work within the stipulated time.
Minister Ghising called the contractor Dayaram Sah to the monitoring site and directed him to complete the work of the stranded bridge as soon as possible. After the contractor Sah promised to complete the work by June under any circumstances, Minister Ghising warned that if he could not do the work, he would terminate the contract.
The contractor Sah stated that about 75 percent of the work on the bridge has been completed and promised to complete the remaining work within the coming May. To build the bridge, Pappu Shivshankar JV signed a contract for 25 crore 36 lakh 24 thousand on 31st June 2074. The residents of Gaidatar are suffering because the bridge is not completed.
Minister Ghisingh also inspected the Badharwa Bridge which is going to be built on the Bagmati River to connect Rautahat and Sarlahi under the Hulaki Highway. Durga Bhagwati Rural Municipality-5 Badharwa Bridge under construction on Bagmati river has been lying idle for 15 years.
Express
Related News
Urge Minister Pokharel to bring the School Education Act quickly
Kathmandu. Before the Minister of Education, Science and Technology, Sasmit Pokharel, the 'Principal Association of Nepal' has drawn attention to issues related to the reform of the school sector, including the need to issue the School Education A...
A call to follow the election code of conduct
Kathmandu. In order to conduct the upcoming House of Representatives elections on February 21 in a clean, fair and free manner, it is called upon to fully follow the election code of conduct.
In a statement issued by Indra Prasad Aryal, Pres...
The process of forming the current government is unconstitutional: Ramesh Badal
Kathmandu. Former Attorney General Ramesh Badal has claimed that the process of forming the current government is unconstitutional. He said this while speaking at the exchange of greetings and wreath laying program on the founder of Nepal Bar Asso...
Oli's comment that the election environment has not yet been created
Jhapa. Chairman of CPN-UML KP Sharma Oli has said that there is still no secure environment for the elections. Talking to mediapersons at Bhadrapur Airport in Jhapa on Sunday, Oli said that looking so far, there is still doubt that the elections w...
At the time of his departure, the Prime Minister gave his own appointment
Kathmandu. Prime Minister Sushila Karki has given attractive appointments to her 'beloveds' when she leaves. In the cabinet meeting held on Sunday, Prime Minister Karki appointed her principal private secretary Ardash Kumar Shrestha as the chairma...
Hark Sampang started a campaign to build a bridge in Darchula
Kathmandu. Hark Sampang, Chairman and Member of Parliament of Labor Culture Party, has started a campaign to build a bridge in Darchula. Sampang of Dharan has started a campaign to build a suspension bridge by displacing the tuin on Kauwa Khola, a...



