Construction contracts will be terminated with businessmen who cannot work on time: Minister Ghising
Chandrapur. Physical Infrastructure and Transport, Urban Development and Energy Minister Kulman Ghising has warned that if the infrastructure construction is not completed on time, the contract with the contractor of the construction company will be terminated. While monitoring the abandoned bridge in Chandinadi located in Chandrapur Municipality-3 of Rautahat today, he stressed that the contractor should complete the work within the stipulated time.
Minister Ghising called the contractor Dayaram Sah to the monitoring site and directed him to complete the work of the stranded bridge as soon as possible. After the contractor Sah promised to complete the work by June under any circumstances, Minister Ghising warned that if he could not do the work, he would terminate the contract.
The contractor Sah stated that about 75 percent of the work on the bridge has been completed and promised to complete the remaining work within the coming May. To build the bridge, Pappu Shivshankar JV signed a contract for 25 crore 36 lakh 24 thousand on 31st June 2074. The residents of Gaidatar are suffering because the bridge is not completed.
Minister Ghisingh also inspected the Badharwa Bridge which is going to be built on the Bagmati River to connect Rautahat and Sarlahi under the Hulaki Highway. Durga Bhagwati Rural Municipality-5 Badharwa Bridge under construction on Bagmati river has been lying idle for 15 years.
Express
Related News
Congress will move forward with greater unity to protect the rights of the people: Purna Bahadur Khadka
Kathmandu. Nepali Congress Executive Chairman Purna Bahadur Khadka has said that the Nepali Congress will move forward with greater unity to protect the constitution, change and people's rights. Speaking at the 73rd fo...
Kathmandu administration permission to detain Durga Prasai for 4 days
Kathmandu. Durga Prasai, a medical practitioner who was arrested on Monday midnight, has been allowed to be detained for 4 days by the Kathmandu administration. The district administration office Kathmandu has allowed...
Prachanda's appeal to the leftists to unite under the same flag of the Communist Party
Kathmandu. The coordinator of CPN Maoist Center Pushpa Kamal Dahal 'Prachandal' has appealed to the leftists with all Maoist streams to unite under one flag of the Communist Party. On Tuesday, through social media, he...
Deuba-Khadka faction's power show preparation, National Assembly of Congress after National Assembly election
Kathmandu. The internal power struggle within the Nepali Congress has come to the surface again. A group close to the party's former chairman Sher Bahadur Deuba and leader Prakashman Singh Khadka has prepared to organize a national meeting after t...
UML has finalized 6 candidates for National Assembly
Kathmandu. CPN-UML has finalized the names of 6 candidates for the National Assembly member election to be held on January 11. The UML, which won seven seats from the alliance, has fielded Roshni Meche from Koshi, Dr. Premkumar Dangal from Bagmati...
The suspension of all those involved in the action of the Congress was lifted, those who left the party were called to return home
Kathmandu. The Nepali Congress has lifted the suspension of its leaders and activists who were punished in the past. The meeting of the central performance committee of the party held on Saturday decided to waive the amnesty for the remaining peri...



