October 28, 2026, Wednesday
English

Chance of rain and snowfall at many places including Koshi, Bagmati and Gandaki, wind and heat in Terai

Main News Image

Kathmandu. At present, there is a combined effect of westerly winds, local winds and a low pressure system near the eastern part of the country in Nepal. Due to this, light rain with thunder and lightning is occurring in a couple of places in Koshi and Bagmati provinces. Although it is partly cloudy in Madhesh province, the weather is mostly clear in the rest of the Terai region.

In the afternoon, it will be generally cloudy in Koshi, Madhesh, Bagmati and Gandaki provinces and the rest of the Himalayan and hilly areas, while it is likely to be partly cloudy in the plains.

mediabaaji add

Related News

Administration request to take special precautions in Mustang on 13th and 14th of October

Mustang. Keeping in view the risk of possible rain, snowfall and avalanche, District Administration Office Mustang has asked the general public and tourists to exercise high vigilance. Based on the special weather bulletin issued by the Weather Fo...

Change across the country: Chance of rain with hailstorm in Terai

Kathmandu. According to the Department of Water and Meteorology, Weather Forecasting Division, there is a possibility of moderate to moderate rain and snowfall with thunder and lightning, windstorm, hailstorm at few places in Madhes Province inclu...

Magnitude 7 earthquake in Tibet, at least 16 dead, 32 injured

Kathmandu. At least 16 people died and 32 were injured when a 7-magnitude earthquake hit Xijang Autonomous Region in southwest China. According to the city's emergency management bureau, the earthquake occurred at 10:33 p.m. on Thursday in Bakken...

Incessant rains flood Saptakoshi: 43 gates of Koshi barrage opened

Inruva.  43 gates of Koshi Barrage have been opened after the flow of water in Saptakoshi river has increased due to continuous rain since Wednesday night. According to the measurement at 6 am on Saturday, the flow of water in the river has r...

This is how the work of the new road is going on in Krishnabhir, preparing to open it in August

Kathmandu. The Prithvi Highway has been blocked for 14 days after the flood that came to Trishuli via Bhotekoshi eroded the lower part of the road along the river bank. On August 14, 100 meters of the road was washed away after Trishuli cut the ba...

After nine days, the flood-swept Veri Corridor in Taksugad was opened, the risk of being blocked again remains

Jajarkot. The road under the Bheri Corridor, which was washed away by flood in Taksugad in the border area of ​​Nalgad Municipality-10 and 11 of Jajarkot, has been put into operation after nine days. The Jajarkot-Dolpa road section, which was bloc...