Bellybridge being installed at Arughat
Gurkha. The Nepali Army and Gorkha Road Plan have jointly started the work of installing a bailey bridge at Arughat. Last Sunday, the Budhi Gandaki flood swept away a part of the Arughat bridge connecting Gorkha and Dhading. The construction of Belybridge has started to resume the temporary transport service at the time of Dasain. According to the Gorkha Road Planning Office, the work of bailey bridge is going on to make the bridge connecting Gorkha and Dhading operational before Dasain.
Express
Related News
NEPSE rose by 48.71 points, the turnover also increased
Kathmandu. On Thursday, the last trading day of the week, the Nepal Stock Exchange NEPSE index has closed significantly higher. Continuing the positive trend of the previous day, the market has turned green. On this day, the NEPSE index increased...
The price of gold and silver decreased, how much is the transaction going on today?
Kathmandu. The price of gold and silver has decreased in Nepali market today. Today gold has decreased by 3 thousand 100 rupees per tola to 282 thousand 100 rupees per tola, according to the Federation of Nepal Gold and Silver Traders.
The exchange rate of foreign currency, the dollar crossed 152 rupees
Kathmandu. Nepal Rastra Bank has determined the official exchange rate of foreign currency for Wednesday. According to the Central Bank, today the buying rate of one US dollar is 152 rupees 31 paisa and the selling rate is 152 rupees 91 pais...
The government has recovered Rs 7,514 crore, more than Rs 5 billion has been deposited in the relief fund.
The Kathmandu. Prime Minister Balen Shah has unveiled the integrated progress report of the government's rescue, relief and rehabilitation work following the devastating flood in the Bhotekoshi River in Rasuwa. In a statement issued in the wake of...
Now the Nagadhunga tunnel will be operational
Kathmandu. Nagadhunga-Sisnekhola tunnel has reached the stage of operation. This project, built with the aim of making travel between Dhading and Kathmandu easier and faster, is expected to make a significant leap in the country's transport infras...
Construction of Kohalpur-Surkhet 132 KV transmission line has been completed
Kathmandu. Nepal Electricity Authority has completed the construction of Kohalpur-Surkhet 132 KV transmission line. The construction of the Kohalpur-Surkhet section has been completed under the Kohalpur-Surkhet-Dailekh 132 KV transmission line pro...



