September 27, 2026, Sunday
English

As the flood increased, all employees of Kaligandaki Hydropower were moved to a safe place

Main News Image

Kathmandu. With the incessant rain, all the employees in the powerhouse of the Kaligandaki hydroelectric project in Syangja have been shifted to a safe place.

The 144 MW project has been closed since Friday, October 9 due to high water flow in Kaligandaki river. 

Sangeeta Giri, Assistant Manager of the project, informed that the powerhouse staff were also sent to a safe place on Sunday, October 11, as the flow of the river was high.

mediabaaji add

Related News

Reduction in forest fires, reduced by pre-monsoon rains

Kathmandu. Chait month of every year is at high risk of forest fire. But last March, the incidence of wildfires decreased only a little. Due to more than average rainfall before the monsoon, there has been a decline in fire incidents in March comp...

Partly cloudy in hilly areas, possibility of heat wave in plains

Kathmandu. At present there is a partial influence of western and local winds in Nepal. Due to its effect, there is partial cloud cover in the hilly areas of the country, including the hilly areas of the Koshi region, while the weather is mainly c...

Chance of light rain and snowfall over hilly and mountainous areas

Kathmandu. At present, there is a partial influence of western low pressure system in the upper atmosphere of Nepal. At present, it is generally cloudy in the hilly and mountainous regions of the country. A couple of places in hilly and Himalayan...

How was the weather across the country on Tuesday?

Kathmandu. At present, there is influence of western low pressure system and local air in Nepal. At present, it is generally cloudy in the hilly and Himalayan regions of the country including Gandaki, Karnali and Sudurpaschim provinces and partly...

Vehicular operation stopped for two days and nights in Narayani Nadi bridge area of Narayanghat Butwal section

Nawalparasi The road will be closed for two days and nights in the Narayani river area connecting Nawalpur and Chitwan in the Narayanghat Butwal section under the East-West Highway. The road will be closed for five hou...

Butwal-Narayangadh road still blocked

Nawalparasi The Butwal-Narayangadh road section, which has been blocked since Friday, has not been fully operational. Transport services were affected after the road became slippery and muddy in the lower section located in Binayi Triveni Rural Mu...