As the flood increased, all employees of Kaligandaki Hydropower were moved to a safe place
Kathmandu. With the incessant rain, all the employees in the powerhouse of the Kaligandaki hydroelectric project in Syangja have been shifted to a safe place.
The 144 MW project has been closed since Friday, October 9 due to high water flow in Kaligandaki river.
Sangeeta Giri, Assistant Manager of the project, informed that the powerhouse staff were also sent to a safe place on Sunday, October 11, as the flow of the river was high.
Express
Related News
Weather forecast: A new weather system is active to bring rain and showers across the country
Kathmandu. At present, along with the influence of western and local winds, the influence of the low pressure area in the lower atmosphere near the eastern part continues. Due to the effect of the low pressure area in the lower atmosphere, m...
Monsoon rains continue across the country: Chance of heavy rains in four states, urge to be cautious
Kathmandu. As the influence of Monsoon winds continues across the country, there is a possibility of rain in most places, according to the Water and Weather Forecasting Division. At present, moderate rains with thunder and lightning are occurring...
All vehicular traffic is closed on Prithvi Highway tonight
Dhading Prithvi Highway will be closed for traffic tonight. The Dhading Chief Administration Office has issued a notice that all vehicles plying on the Prithvi Highway have been completely stopped from 8:00 PM today to 5:00 AM tomorrow.
The...



