Vehicular operation stopped for two days and nights in Narayani Nadi bridge area of Narayanghat Butwal section
Nawalparasi The road will be closed for two days and nights in the Narayani river area connecting Nawalpur and Chitwan in the Narayanghat Butwal section under the East-West Highway. The road will be closed for five hours at night to blacken the road from the Narayani river bridge to the west of that section. Engineer Ishwar Bahadur Rizal, Chief Planning Engineer of Narayanghat Butwal Road Project, Eastern Section, informed that the highway will be closed on November 5th and 6th from 11:00 PM to 4:00 AM the next day.
"It has been decided to close the road at night for the purpose of blackening the part of the approach road towards Narayani Bridge Gaindakot of Narayanghat Butwal road section which is under construction," he said.
Rizal informed that when the road is closed at night, vehicles going east will be stopped at various places in Nawalpur and vehicles coming west will be stopped at various places in Chitwan. As the road will be closed for 6 hours at night, he requested to stop the vehicle at the designated place and wait for the turn or use an alternative road.
Buses, minibuses, microbuses, small four-wheelers among the vehicles going eastward from Butwal via Nawalpur will stop at Thumsi westward. Similarly, large cargo vehicles like trucks, trailers, containers, waves will stop from Beldiha to the west.
Express
Related News
Kathmandu valley was blanketed by snow, but there is no immediate impact on flights and transport
Kathmandu. Cold has been spreading in Kathmandu Valley since Saturday morning. According to the Weather Forecast Division, the hazy atmosphere seen in the valley sky after 10 am is due to the frost haze. Sanjeev Adhikari, meteorologist of the divi...
How was the weather throughout the country on Thursday?
Kathmandu. At present, the water and weather forecast division has said that the western wind has partial influence in the country and the high hilly and Himalayan regions of Koshi, Gandaki and Karnali provinces are generally cloudy and the weathe...
Risk of flooding in five districts today, urge to be alert
Kathmandu. The Flood Forecasting Division under the Department of Water and Meteorology has asked people to be vigilant saying that there is a risk of flooding in five districts today on June 18. Today, the flow of small rivers flowing through Kan...
Monsoon rains continue across the country: Chance of heavy rains in four states, urge to be cautious
Kathmandu. As the influence of Monsoon winds continues across the country, there is a possibility of rain in most places, according to the Water and Weather Forecasting Division. At present, moderate rains with thunder and lightning are occurring...
As the flood increased, all employees of Kaligandaki Hydropower were moved to a safe place
Kathmandu. With the incessant rain, all the employees in the powerhouse of the Kaligandaki hydroelectric project in Syangja have been shifted to a safe place.
The 144 MW project has been closed since Friday, October 9 due to high water flow...
Torrential rains: The death toll has risen to more than 900, with more than 4,000 people still missing
The Kathmandu. According to the National Disaster Risk Reduction and Management Authority, the bodies of 903 people have been found so far.
According to the data released by the authority till 9 am today, 4,247 people are still incommunicad...



