October 6, 2026, Tuesday
English

Vehicular operation stopped for two days and nights in Narayani Nadi bridge area of Narayanghat Butwal section

Main News Image

Nawalparasi The road will be closed for two days and nights in the Narayani river area connecting Nawalpur and Chitwan in the Narayanghat Butwal section under the East-West Highway. The road will be closed for five hours at night to blacken the road from the Narayani river bridge to the west of that section. Engineer Ishwar Bahadur Rizal, Chief Planning Engineer of Narayanghat Butwal Road Project, Eastern Section, informed that the highway will be closed on November 5th and 6th from 11:00 PM to 4:00 AM the next day.

"It has been decided to close the road at night for the purpose of blackening the part of the approach road towards Narayani Bridge Gaindakot of Narayanghat Butwal road section which is under construction," he said.
Rizal informed that when the road is closed at night, vehicles going east will be stopped at various places in Nawalpur and vehicles coming west will be stopped at various places in Chitwan. As the road will be closed for 6 hours at night, he requested to stop the vehicle at the designated place and wait for the turn or use an alternative road.

Buses, minibuses, microbuses, small four-wheelers among the vehicles going eastward from Butwal via Nawalpur will stop at Thumsi westward. Similarly, large cargo vehicles like trucks, trailers, containers, waves will stop from Beldiha to the west.

mediabaaji add

Related News

Earthquake centered around Rayal in Bajhang

Kathmandu. The epicenter of the earthquake was around Rayal in Bajhang district. According to the National Earthquake Measurement and Research Center Lanchaur, an earthquake of magnitude 4.1 took place today at 1:14 PM with its epicenter near Raya...

Weather forecast: Chance of rain in some places of hilly and Himalayan areas

Kathmandu. At present, there is a partial influence of western winds as well as local winds in Nepal. It is generally cloudy in the Himalayan and hilly areas of the country including Koshi Province, while the rest of the country is partly cloudy....

Dhulikhel-Khawa road will be closed at night for 10 days from tomorrow

Kathmandu. Traffic will be closed on the Dhulikhel-Khawa road section under the Araniko highway from Sunday night. Traffic will be closed from 6 pm to 5 am for road upgrading. The Division Road Office Bhaktapur has informed that traffic will be st...

The weather forecast will be cloudy in most of the places in Rai

Kathmandu. There is a partial effect of western wind over the country. Also, there is a partial effect of the low pressure system developed in the southwest Bay of Bengal. Currently, the weather is partly cloudy in Koshi, Madhesh, Bagmati and Gand...

Landslide in Tibet bursts a large dam, high risk in Bhotekoshi and Trishuli coastal areas

Rasuwa In the upper part of the Lhendi River in Tibet, China, a large natural lake formed by the damming of the river has burst after an avalanche. The Chinese authorities have officially informed the Nepalese side about the lake bursting. The inf...

Monsoon gradually becoming active, there will be heavy rain in some places on June 16 and 17

Kathmandu. Indicating that the monsoon is gradually becoming active in the country, the Water and Weather Forecast Division has said that there will be heavy rains in most parts of the country on June 16 and 17. The division has issued a special w...