June 11, 2026, Thursday
English

Today is the last day to file for Everest Color's IPO

Main News Image

Kathmandu. Today is the last day to apply for the IPO that Everest Color Limited is issuing to the general public from June 22. In the first phase, IPOs are distributed to Nepalis who are employed abroad and in the second phase, IPOs are being issued to general public.

This company has received permission from the Nepal Securities Board to issue a total of 790,000 IPO shares at the rate of Rs. 100 per share, which will be 26.33 percent of its issued capital of Rs.

mediabaaji add

Related News

NEPSE increased by 5 percent, turnover of 15.78 billion

Kathmandu. Nepal Stock Exchange NEPSE increased by 5.01 points to 2936.56 points. Today, when 38 million 73 thousand shares of 342 companies were bought and sold, a turnover of 15.78 billion was made.

Greenery has come in 7 sub-indicators to...

What is the exchange rate of foreign currency on Thursday?

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to Rashtra Bank, the buying rate of one US dollar has been fixed at 141 rupees 52 paisa and the selling rate is 142...

NEPSE decreased by 10 points, turnover exceeded 5 billion!

Kathmandu. On Sunday, the first day of the week, the NEPSE index fell by 10.29 points to 2,610.63. About 1.3 million shares of 323 companies were traded, with a total turnover of 5.01 billion rupees. Out of the 13 sub-groups, hotels, manufacturing...

Historic Free Trade Agreement between India and New Zealand

Kathmandu. A new chapter has started in the bilateral trade relations between India and New Zealand from Monday. The two countries have signed a historic free trade agreement. With the agreement, it is expected to bring radical changes in the fiel...

An arch bridge is being built at a cost of 1 billion 21 crores

Damauli. The work of a four-lane bridge under construction at Damauli Bazar under the Muglin-Pokhara road section is going on in full swing. Muglin Pokhara Road Plan Eastern Section has reported that 77 percent progress has been made on the bridge...

BP highway reconstruction is accelerated, 3.2 km road will be constructed through JICA for 2.6 billion

Ramechhap. The remaining road section of the Kavre-Sindhuli section from Piple in Kavre to Barkhekhola in Sindhuli will be constructed in two lanes with the support of Japan International Cooperation Agency (JICA).

Suman Yogesh, Head of Road...