The road construction of the southern section is in the final stage
Kathmandu. The construction work of the southern road section under the East-West highway has reached its final stage. The project claims that the concrete slope in this section will last for at least 30 years. According to Chudaraj Dhakal, project director of ADB's project directorate under the road department, keeping in mind the geological structure of the valley, the risk of landslides and the increasing traffic volume, concrete slope technology has been adopted instead of asphalt.
He said that if the construction of the road is done according to the design and the standards including load control are implemented effectively, the life of the slope can reach up to 40 years. He expressed the belief that this will end the suffering of the commuters on the lower section of the road for years.
According to Dhakal, the carrying capacity of the road has been determined up to 10 tons on a single wheel. He said that the road has been designed based on the traffic volume of the next 20 to 30 years and that even if 12,000 to 20,000 vehicles operate daily, the structure of the road will not be affected.
Express
Related News
Chilime hot water bather's knee
Rasuwa The number of devotees who bathe in Chilime hot water in Rasuwa has started to increase again recently. Bathing in hot water is believed to cure various diseases. The devastating earthquake of Baisakh 12, 2072 a...
Inspector General Karki wore the badge, took over the police command
Kathmandu. The newly appointed Inspector General of Police IGP Dan Bahadur Karki has worn the badge. Home Secretary Rameshwar Dangal gave Karki the badge of Inspector General of Police in a program organized in the min...
Oath of the newly appointed Vice Chancellor of the University by the Minister of Education
Kathmandu. Minister of Education and Sports and Vice-Chancellor of Universities Sasmit Pokharel administered the oath of office and secrecy to the newly appointed Vice-Chancellors of various universities today in a program held at the Ministry.
The epicenter of the earthquake was Saipal
Bajura. An earthquake has occurred around Saipal in Bajhang. Earthquake measuring center Surkhet reported that an earthquake measuring 4.4 on the Richter scale occurred at 12:09 PM on Sunday with its epicenter at Saipa...
Chance of light rain over hilly areas of Kosi and Karnali regions
Kathmandu. There is currently no significant weather system impact across the country. According to the Department of Water and Meteorology, it will be partly cloudy in the hilly areas of all the provinces this afternoon, while the remaining areas...
The minimum temperature of Kathmandu valley dropped by 3 degree Celsius in one day
Kathmandu. The minimum temperature of Kathmandu valley has dropped sharply. According to meteorologist Rojan Lamichhane of the weather forecasting division, the minimum temperature of Kathmandu valley has dropped to 6....


