August 31, 2026, Monday
English

The road construction of the southern section is in the final stage

Main News Image

Kathmandu. The construction work of the southern road section under the East-West highway has reached its final stage. The project claims that the concrete slope in this section will last for at least 30 years. According to Chudaraj Dhakal, project director of ADB's project directorate under the road department, keeping in mind the geological structure of the valley, the risk of landslides and the increasing traffic volume, concrete slope technology has been adopted instead of asphalt.

He said that if the construction of the road is done according to the design and the standards including load control are implemented effectively, the life of the slope can reach up to 40 years. He expressed the belief that this will end the suffering of the commuters on the lower section of the road for years.

According to Dhakal, the carrying capacity of the road has been determined up to 10 tons on a single wheel. He said that the road has been designed based on the traffic volume of the next 20 to 30 years and that even if 12,000 to 20,000 vehicles operate daily, the structure of the road will not be affected.

mediabaaji add

Related News

The Election Commission stopped the appointment of judges

Kathmandu. The Judicial Council has rejected the Council's request for writing to the Election Commission to approve the appointment of judges on the basis of seniority. The Commission has written to the Judicial Council not to appoint judges sayi...

Trekking at Annapurna Base Camp halted: Tourists brought to Narchang and Bhurung hot springs

Myagdi. Tourists who went on a visit to tourist spots in Myagdi and Mustang are in trouble after snowfall accompanied by light rain. Since last night, there has been light rain in the hilly areas and snowfall in the up...

The minimum temperature in Kathmandu dropped to 9 degree Celsius

Kathmandu.  The temperature is falling and the cold is increasing all over the country. At the same time, the minimum temperature of Kathmandu Valley has dropped to 9 degrees Celsius.
According to Meteorologist David Dhakal of the Weathe...

Irrigation Day being celebrated today, the challenge is to provide facilities to still arable land

Kathmandu. Irrigation Day and the Foundation Day of Water Resources and Irrigation Department are being celebrated today by organizing various programs under the slogan 'Systematic use of water resources, help in building a prosperous country'. In...

Tension in Birganj against Dhanusha incident, police fired tear gas

Birganj. The Muslim community staged a violent protest in Virganj of Parsa against the vandalism of a mosque in Dhanwal by unknown persons. During the protest on Sunday, the situation in Birgunj became tense for some time when there was a clash be...

A new weather system is coming in again, chances of heavy rain in dozens of eastern districts

Kathmandu. Due to the weather system formed in the Arabian Sea, various parts of the country are currently experiencing rain and snow. Although the system will leave and improve from Wednesday, another weather system w...