July 5, 2026, Sunday
English

The road construction of the southern section is in the final stage

Main News Image

Kathmandu. The construction work of the southern road section under the East-West highway has reached its final stage. The project claims that the concrete slope in this section will last for at least 30 years. According to Chudaraj Dhakal, project director of ADB's project directorate under the road department, keeping in mind the geological structure of the valley, the risk of landslides and the increasing traffic volume, concrete slope technology has been adopted instead of asphalt.

He said that if the construction of the road is done according to the design and the standards including load control are implemented effectively, the life of the slope can reach up to 40 years. He expressed the belief that this will end the suffering of the commuters on the lower section of the road for years.

According to Dhakal, the carrying capacity of the road has been determined up to 10 tons on a single wheel. He said that the road has been designed based on the traffic volume of the next 20 to 30 years and that even if 12,000 to 20,000 vehicles operate daily, the structure of the road will not be affected.

mediabaaji add

Related News

The minimum temperature of Kathmandu valley dropped by 3 degree Celsius in one day

Kathmandu. The minimum temperature of Kathmandu valley has dropped sharply. According to meteorologist Rojan Lamichhane of the weather forecasting division, the minimum temperature of Kathmandu valley has dropped to 6....

Class 12 exam starting today, 93 thousand less students than last year

Kathmandu. The final examination of secondary level class 12 is starting today from Monday. 4 lakh 18 thousand 800 examinees from all over the country are participating in the examination conducted by the National Examination Board. According to t...

Four subject experts appointed to Academic Council of CITIVITY

KathmanduF. The Ministry of Education and Sports Technology has nominated four subject experts as members of the Academic Council to enhance the academic dignity of Technical Education and Vocational Training Council CITIVITY.

The Ministry h...

Mahashivratri preparations in full swing: Pashupatinath shines

Kathmandu. On the occasion of this year's Mahashivratri festival, the work of painting, cleaning and improving the infrastructure of the Pashupatinath temple complex and surrounding areas has been started. The Pashupati Area Development Fund has i...

Maghe Sankranti is being celebrated today, a public holiday across the country

Kathmandu. Today is the first day of the month of Magha i.e. Maghe Sankranti. It is being celebrated by eating ghee, chaku and yam and other dishes. Since today the Sun will enter Makar Rashi from Sagittarius, Maghe Sankranti is also called Makar...

Kulman gave thanks after the Bancharedanda obstacle was removed

Kathmandu. Minister of Energy, Water Resources and Irrigation Kulman Ghising has expressed his happiness after the obstruction caused by the locals at Bancharedanda waste disposal site in Kathmandu Valley has been remo...