The road construction of the southern section is in the final stage
Kathmandu. The construction work of the southern road section under the East-West highway has reached its final stage. The project claims that the concrete slope in this section will last for at least 30 years. According to Chudaraj Dhakal, project director of ADB's project directorate under the road department, keeping in mind the geological structure of the valley, the risk of landslides and the increasing traffic volume, concrete slope technology has been adopted instead of asphalt.
He said that if the construction of the road is done according to the design and the standards including load control are implemented effectively, the life of the slope can reach up to 40 years. He expressed the belief that this will end the suffering of the commuters on the lower section of the road for years.
According to Dhakal, the carrying capacity of the road has been determined up to 10 tons on a single wheel. He said that the road has been designed based on the traffic volume of the next 20 to 30 years and that even if 12,000 to 20,000 vehicles operate daily, the structure of the road will not be affected.
Express
Related News
Chhath officially begins in Mithila from today
bow Chhath has officially started in Mithila from today. The ghats of Janakpurdham are being decorated for Chhath which is the biggest festival of Mithila. Decoration work is being done in Gangasagar, Aragaja Sir, Dash...
Joshi entered the Guinness Book of Records by running on Daura Surwal
Kathmandu. Bal Joshi, an American runner of Nepali origin, has written his name in the Guinness book after completing the 'World Marathon Challenge' in Daura Surwal. Joshi has written his name in the Guinness book by running in Daura Suruwal in se...
Here is today's weather forecast
Kathmandu. Currently, there is no significant weather system impact across the country, according to the Water and Weather Forecasting Division. According to the department, the weather will remain mostly clear in the...
Pedestrian killed in motorcycle collision, both driver and rear passenger arrested
Kathmandu. A pedestrian has died after being hit by a motorcycle in Doti. 68-year-old Taradevi Balayer of Shikhar Municipality-10 Bandungrisain died in a collision with a motorcycle numbered Suppr.01013p 12.
According to the district police...
Melamchi water stopped completely
Kathmandu. A group of committees including vendors, Melamchi flood victims and others have stopped the transfer of Melamchi water supply to Kathmandu saying that their demands have not been met. Jagarnath Das, executiv...
A trash barrier was placed in Bagmati River to collect floating wastes
Kathmandu. The empowered Bagmati Civilization Integrated Development Committee under the Ministry of Urban Development has installed a trash barrier to collect the waste materials floating in the rivers of Kathmandu. At present, after the completi...


