August 16, 2026, Sunday
English

The construction company's commitment to complete Kamala Bridge within three months

Main News Image

sirah After the physical infrastructure and transport minister Kulman Ghisingh's on-site inspection and instructions, the construction company has committed to complete the unfinished Kamala bridge connecting Dhanusha and Siraha within three months.

This bridge under Hulaki Highway, which is considered the life line of Terai (Madhes), was agreed to be completed within three years in 2068, but it remained incomplete even after 14 years. Minister Ghisingh inspected the bridge construction site on Friday and closely felt the risk, suffering and insecurity that the locals have been facing for years.

After the inspection, Minister Ghising wrote on social media today and mentioned that his heart was heavy. "This bridge, which was started in May 2068 with a contract agreement to be completed in three years, is still incomplete and the local residents are suffering the most", he wrote further, "During the monitoring, the daily suffering, risk and anger experienced by the local residents became heavy. It gave me a deep sense of how challenging the hardships of the local residents are."

He informed that a detailed discussion has been held on the temporary option to facilitate the immediate movement of the locals and the necessary process will be carried out. In addition, he clarified that the related agencies will be responsible for the questions raised on the technical side and ministerial level monitoring will continue.

mediabaaji add

Related News

Vice-Chancellor, Principal and Registrar resigned

Kathmandu. The top officials of Tribhuvan University, the country's oldest and largest educational institution, have collectively resigned from their posts.

Vice-Chancellor Prada Deepak Aryal, Principal Prada Khadg KC and Registrar Prada Ked...

NEPSE welcomes election results, trade closes with six percent increase

Kathmandu. Today's trading has been closed with the third consecutive positive circuit in the Nepal Stock Exchange NEPSE index. Today, the NEPSE index increased by 162.93 points to 2,875.43 points. This is an increase of six percent. On the first...

What is the exchange rate of foreign currency on Wednesday?

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to Rashtra Bank, the buying rate of one US dollar has been fixed at 141 rupees 48 paisa and the selling rate is 142...