Solu Hydropower IPO to issue from today
Kathmandu. Solu Hydropower Limited has issued an initial public issue IPO for the local residents of the project-affected areas and Nepali workers who are employed abroad from today on November 7th. The company was allowed to issue 20 percent of the issued capital of 10 billion rupees, i.e. 20 million shares worth 2 billion rupees. Out of which, 1 crore ordinary shares worth Rs 1 billion at Rs 100 per share have been issued targeting the local residents of the project affected areas.
For the IPO, it has been arranged that the application can be made for a minimum of 10 shares and a maximum of 1 lakh shares. The application period for the local residents of the project-affected areas will last until November 21st at the earliest and until January 7th at the latest. For Nepalese who are employed abroad, the earliest date for applying is 10th November and the latest is 21st November.
According to the company, based on the environmental impact assessment report on the project affected, 40 million shares will be distributed to the residents of Solu Dudhkunda Municipality-7 and 11 and Thulung Dudhkoshi Rural Municipality-1 and 60 million shares will be distributed to the local residents of other affected wards.
Express
Related News
After the opening of Tatopani and Rasuwagadhi, Korlanaka's business declined
Mustang. After Tatopani and Rasuwagadhi checkpoints came into operation, the import-export trade from Nepal-China North Korlana located in Mustang has decreased. According to the Mustang Customs Office, there are currently very few cargo container...
The price of gold rose sharply, how much did it reach per tola?
Kathmandu. On Friday, the price of gold in the Nepali market increased by Rs. 2900 per tola. According to the Federation of Nepal Gold and Silver Traders, the price of gold in the Tola was Rs 2,59,600 per tola on Thursday, which was Rs 2,62,500 pe...
The NEPSE index fell by double digits, trading at four billion
Kathmandu. The Nepal Stock Exchange NEPSE index fell by double digits. Today, the NEPSE index decreased by 12.50 points to 2,594.87 points. According to NEPSE, 1 crore 12 lakh 72 thousand 168 shares of 330 companies we...
Heavy damage to power sector due to Bhotekoshi flood, 12 projects of 431 MW closed
Kathmandu. About 10 percent of the country's total power generation capacity has been affected due to the floods in the Bhotekoshi River in Rasuwa. After the floods caused great damage to power generation, transmission and distribution structures,...
With the beginning of Tihar, the buying and selling of flowers increased, Nepal is becoming self-sufficient in flower business
Kathmandu. With the beginning of Tihar, the second biggest festival of Nepalese, the buying and selling of flowers has increased rapidly. In Tihar, which is a festival of flowers and colors, there is a lot of use of flowers from worship to various...
Adding date of commercial production of hydropower projects
Kathmandu. The Nepal Electricity Authority has prepared to add RCOD to the final date for starting commercial production of hydropower projects that have not been able to start commercial production due to various reasons despite the PPA.
Th...



