November 6, 2026, Friday
English

Prithvi Highway: Malekhu-Mugling road section will be closed for three hours today

Main News Image

Chitwan. The Malekhu-Mugling road section under Prithvi Highway will be closed for three hours today. Due to the need to put a girder on the passenger side of Akashe Bridge in Mazhimtar of the road section, the traffic on that road section will be completely closed from 11:00 am to 2:00 pm.

According to Sachendra Mishra, information officer of Nagadhunga Mugling Road Project West Section, the road is going to be closed for the purpose of placing the bridge girder. He informed that all types of vehicles traveling through the Malekhu (Mugling road section) will be banned during that period.

During the road closure, the project has requested the drivers and passengers to patiently remain in place, maintain lane discipline and follow the traffic rules. The project has also apologized for the inconvenience caused when the road is closed.

mediabaaji add

Related News

Now NOC from home for students going to study abroad

Kathmandu. Students who are going to study abroad can now get the foreign study permit 'No Objection Certificate' NOC from home. The NOC branch at Sanothimi under the Ministry of Education, Science and Technology has completed the API between the...

After the flood of Roshi Khola, blocked BP highway in operation

Ramechhap. The BP highway, which was blocked due to the flood in Roshi River, has resumed operation. The highway, which was blocked after the flood washed away the diversion on Saturday, has been operational since Monday evening. According to the...

It got colder all over the country, the minimum temperature in Kathmandu was 3 degrees

Kathmandu. According to the Weather Forecast Division, there is a partial effect of western wind across the country. Even today, many places in Terai and hilly areas are covered with fog and fog. In the afternoon, fog and fog will remain in many p...

Preparation of the government to reduce the risk of floods and landslides, postponement of examinations and ban on employee leave


The Kathmandu. The government has intensified the preparation and response work to prevent the loss of lives due to possible floods, landslides and drowning caused by the continuous rain across the country. According to the instructions given...

Landslide in Baglung: 10 people died in two days, 24 houses were damaged in Tanahun

Baglung. 10 people died and one person went missing in Baglung due to the landslides that followed the incessant rain. In the last two days, landslides have caused huge human losses in the district. On Sunday alone, 9 people have died and one pers...

Weather: It will be cloudy in the plains, the weather will be clear in the hills and mountains

Kathmandu. According to the Weather Forecasting Division, there is currently no significant weather system impact in the country, while some places in the Terai region have experienced cold and flu. The weather is mainly clear in the hilly and mou...