October 13, 2026, Tuesday
English

Preparing to operate traffic through the reconstructed BP highway during rainy season

Main News Image

Kavrepalanchok. BP Highway, which has been damaged by repeated floods and landslides, is currently undergoing permanent reconstruction. Divisional Road Office Bhaktapur said that the permanent reconstruction work started at three places of the damaged road section of the highway, which is a short distance connecting the eastern and central hilly areas of Nepal with the federal capital Kathmandu, has been accelerated.

Senior Divisional Engineer Suman Yogesh said that the construction work has been accelerated so that the infrastructure can be built in the risky areas of the highway before the rains and the means of transport can be operated from the highway itself.

mediabaaji add

Related News

What is the exchange rate of which foreign currency on Sunday?

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for Sunday. According to the fixed rate, the buying rate of one US dollar is 144 rupees 02 paisa and the selling rate is 144 rupees 62 paisa.

Similarly, the bu...

Electricity lines of 6 industries that did not pay premium tariff were cut

Kathmandu. The Nepal Electricity Authority has started cutting the lines of industries that have not paid premium tariffs. Kulman Ghising, who was removed as the Executive Director of Electricity Authority for trying t...

Here is the foreign currency exchange rate for today

Kathmandu. Nepal Rastra Bank has determined the foreign currency exchange rate for 9 Saturday 0 today. According to the National Bank, the buying rate of one US dollar has been fixed at 154 rupees 21 paisa and the selling rate is 154 rupees 81 pai...

What is the exchange rate of foreign currency on Saturday?

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the National Bank, the buying rate of one US dollar has been fixed at 141 rupees 70 paisa and the selling rate h...

Fuel supply from Tribhuvan Rajpath after the road was washed away in Krishnabhir

Kathmandu. After the road was blocked in the Krishnabhir section of Dhading under the Prithvi Highway, Nepal Oil Corporation is continuing to supply petroleum products and LP gas to Kathmandu Valley and surrounding areas through the alternative ro...

The price of gold and silver decreased, how much is the transaction going on today?

Kathmandu. The price of gold and silver has decreased in Nepali market today. Today gold has decreased by 600 rupees to 277 thousand 300 rupees per tola, according to the Federation of Nepal Gold and Silver Traders.

On Tuesday, it was traded...