Preparing to operate traffic through the reconstructed BP highway during rainy season
Kavrepalanchok. BP Highway, which has been damaged by repeated floods and landslides, is currently undergoing permanent reconstruction. Divisional Road Office Bhaktapur said that the permanent reconstruction work started at three places of the damaged road section of the highway, which is a short distance connecting the eastern and central hilly areas of Nepal with the federal capital Kathmandu, has been accelerated.
Senior Divisional Engineer Suman Yogesh said that the construction work has been accelerated so that the infrastructure can be built in the risky areas of the highway before the rains and the means of transport can be operated from the highway itself.
Express
Related News
Suryakund Hydro is issuing IPO for general public from Sunday
Kathmandu. Suryakunda Hydro Electric is going to open the IPO sale for the general public from January 18th this Sunday. The company is going to issue a total of 5 lakh 72 thousand 431 shares of Rs 100 to the general public in the second phase.&nb...
The price of gold decreased, now how much per tola?
Kathmandu. The price of gold has decreased in Nepali market today. Gold tola has fallen by 500 rupees. According to the Federation of Nepal Gold and Silver Traders, today the price of gold has remained at Rs 3 lakh six thousand 200 per tola. Today...
The tea industry will be closed due to Indian barriers!
Elam. The tea industry in Suryodaya region of Elam is going to be closed after India tightens the Nepalese tea market. Suryodaya Orthodox Tea Producers Association Nepal, to which Tripanna Industry is affiliated, has announced the closure of the i...



