October 2, 2026, Friday
English

Preparing to operate traffic through the reconstructed BP highway during rainy season

Main News Image

Kavrepalanchok. BP Highway, which has been damaged by repeated floods and landslides, is currently undergoing permanent reconstruction. Divisional Road Office Bhaktapur said that the permanent reconstruction work started at three places of the damaged road section of the highway, which is a short distance connecting the eastern and central hilly areas of Nepal with the federal capital Kathmandu, has been accelerated.

Senior Divisional Engineer Suman Yogesh said that the construction work has been accelerated so that the infrastructure can be built in the risky areas of the highway before the rains and the means of transport can be operated from the highway itself.

mediabaaji add

Related News

More liquidity in banking system, Rashtra Bank pulling 50 billion today

Kathmandu. Nepal Rastra Bank is going to withdraw 50 billion rupees from the banking system today, January 28th. To manage excess liquidity, the central bank is using deposit collection tools to withdraw money from the banking system. 

...

US dollar and pound rise: Here are today's foreign exchange rates

Kathmandu. Nepal Rastra Bank has determined the new exchange rate of foreign currency for Thursday. According to the Central Bank, there has been an increase in the price of the American dollar today, the buying rate of which has remained at 144 r...

30.02 points decline in NEPSE, turnover of 4.9 billion

Kathmandu. On the first trading day of the week, the stock market NEPSE index fell by 30.02 points to 2566.09. On NEPSE, 10.6 million 19 thousand 180 shares of 323 companies were bought and sold, and over 4.9 billion shares were traded. Today, whi...

Here is the foreign currency exchange rate for today

Kathmandu. Nepal Rastra Bank has determined the foreign currency exchange rate for 9 Saturday 0 today. According to the National Bank, the buying rate of one US dollar has been fixed at 154 rupees 21 paisa and the selling rate is 154 rupees 81 pai...

Dissatisfaction of Reliance Spinning Mills over first transaction price in NEPSE

Kathmandu. Reliance Spinning Mills Limited has expressed displeasure with the opening range of the company's shares set by the Nepal Stock Exchange NEPSE. Issuing a statement, he expressed his displeasure that the opening range of Company Play sha...

Financial management of Tila 1 hydropower project led by NMB Bank

Kathmandu. NMB Bank Limited has successfully completed the financial management as the lead bank for the Tila 1 Hydropower Project located in Calikot district with a capacity of 440 MW according to the production permit. Promoted by SC Power Compa...