Partial influence of western low pressure system remains, light rain likely in these three states today
Kathmandu. At present, the effect of the remnants of Cyclone Arnab, a low pressure area near western Nepal, has weakened. As the western low pressure system in the upper atmosphere has only a partial effect, the weather is likely to gradually improve, said the Meteorological Division.
At present, it will be generally cloudy in the mountainous areas of the country including Lumbini province, while it will be partly cloudy in the rest of the country.
Express
Related News
Muglin-Pokhara road will be closed for 4 hours daily for 10 days, these are alternative routes
Kathmandu. Muglin-Pokhara road will be closed for 4 hours daily for 10 days from today. Under the Muglin-Pokhara highway improvement plan, the western section will be closed for four hours daily to upgrade the road, ac...
Effect of Monsoon air across the country: Chance of heavy rain in various regions including Far West
Kathmandu. Monsoon winds are now directly affecting the country. According to the Department of Water and Weather Forecasting, the low pressure line of Monsoon is located in the vicinity of Sardar place in the east and near Nepal in the north of S...
Tribhuvan University to Offer Chance Examinations for Students Since 2053 BS
Kathmandu — Tribhuvan University (TU) has been rapidly conducting irregular examinations in order to improve its academic calendar. The TU Office of the Controller of Examinations has been holding the currently irregular examinations at a brisk pa...
Madhyapahari highway blocked due to heavy snowfall
Kathmandu. Due to heavy snowfall in East Rukum, Madhyapahari Lokmarg has been blocked. Due to continuous snowfall since last night, the Lukum-Patihalna section in Bhume Rural Municipality 1 of Rukum East has been blocked.
District Police Off...
Blocked BP Highway in operation, traffic resumed after clearing landslides and landslides
make it Traffic has resumed on the Kavrepalanchok section under the BP highway, which has been blocked due to incessant rain. After the landslides and mudslides that fell at various places were removed, the highway was reopened this evening. Due t...
The road department has formed a 'task force', 155 equipments to remove landslides from the highway
Kathmandu. With the onset of monsoon, 155 equipments have been mobilized in different sections of highways across the country to remove landslides. An additional 122 devices have been deployed. Under the road department, the mechanical department...


