NEPSE decreased by 10 points, turnover exceeded 5 billion!
Kathmandu. On Sunday, the first day of the week, the NEPSE index fell by 10.29 points to 2,610.63. About 1.3 million shares of 323 companies were traded, with a total turnover of 5.01 billion rupees. Out of the 13 sub-groups, hotels, manufacturing and trade have increased while the remaining 10 groups have decreased. Win Nepal Microfinance and Srinagar Agritech have a positive circuit, while SY Panel Nepal is leading in business.
Express
Related News
NEPSE decreased by 13 points, turnover exceeded 5 billion!
Kathmandu. On the fourth trading day of the week, the NEPSE index fell by 13.35 points to 2635.94 points. Today, when 1.6 million shares of 323 companies were bought and sold, the total turnover reached 5.17 billion rupees.
In trading, the s...
What is the exchange rate of foreign currency on Tuesday?
Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to Rashtra Bank, the buying rate of one US dollar has been fixed at 141 rupees 52 paisa and the selling rate is 142...
The value of the US dollar is at an all-time high
Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the fixed exchange rate, the value of the US dollar has reached its highest point so far. According to the determined exchange rate, the buyi...
NMB Bank launches Pre-Owned EV loan for personal and commercial purposes
Kathmandu. NMB Bank Limited has launched a second-hand EV loan facility with the aim of facilitating the purchase of old (second-hand) electric vehicles for individuals and various organizations. This initiative of the bank, which is prioritizing...
The prices of the US dollar and the euro have increased; what about the others?
Kathmandu. Today, the prices of the US dollar and the euro have increased. According to the Nepal Rastra Bank, the buying rate of one US dollar today is 151.85 and the selling rate is 152.45. On Monday, the buying rate was 151 rupees 56 paisa and...
Electricity generation started from Setikhola project
Kaski. Setikhola hydropower project of 22 megawatt capacity, completed in Pokhara Metropolitan City-33 of Kaski, has started generating electricity. The project promoted by Seti Khola Hydropower Limited started in December 2078.
After the in...



